Laserfiche WebLink
KP Roof and airs p a d Roof Improvements Project Section 07600 <br /> Community Transit, ITB#2019-028 Sheet Metal Roofing and Siding <br /> 3.05 Cleaning and Protection <br /> A. Remove temporary protection coverings and strippable films, if any, once metal panels are <br /> installed. On completion of metal panel installation, clean finished surfaces as recommended <br /> by the metal panel manufacturer. Maintain clean condition during construction. <br /> B. After metal panel installation, clear weep holes and drainage channels of obstructions, dirt, <br /> and sealant. <br /> C. Replace metal panels that have been damaged or have deteriorated beyond successful repair <br /> by finish touch-up or similar minor repair procedures, as approved by the sheet metal <br /> manufacturer. <br /> END OF SECTION <br /> Construction Documents <br /> 07600-7 + /� <br />