Laserfiche WebLink
• • <br /> b. City of Everett Comment:The parapet and wall appear to create additional wind loading on the <br /> roof structure. This may result in lateral analyses needing to be performed, including <br /> modifications to the roof load path. The DOR should comment on the proposed portions of the <br /> IEBC governing this change. <br /> Response: <br /> KPFF Comments: No walls have been added. The curb atop the existing parapet has increased in <br /> height^2.5". By inspection,this small increase in tributary area will result in a wind loading of <br /> only 1-2%,which is negligible. No lateral analysis is necessary. <br /> d. City of Everett Comment:The parapet encloses the roof and may cause potential ponding <br /> issues. Documentation substantiating that the revised design complies with the drainage <br /> requirements of IBC Section 1503.4 shall be submitted for review. <br /> Response: <br /> Wetherholt Comments: The existing roof structure (Building C canopy) is positively sloped <br /> towards the south gutter. Overflow ports will be installed through the outboard leg of the <br /> gutter, per detail 4/R9, adjacent each downspout, should the downspouts become plugged. The <br /> overflow ports will be positioned beneath the plane of the roof to prevent water back-up onto <br /> the roof. I noticed the size of the overflow scuppers are not included. We are assuming two- <br /> 5"x5"overflow scuppers. Refer to attached overflow calculations. <br /> Standing water on the roof surface should be considered minimal to none. <br /> 5. City of Everett Comment:Sheet 51.0 is included with the set. Detail 5 appears to show some sort of new <br /> structural member. The detail references Sheet R12,which is not included in this set. Clarify if this detail <br /> applies to this structure. <br /> Response: <br /> KPFF Comments: Detail 5/S1.0 and Sheet R12 apply only to the Vault Canopy building; however,there are <br /> still details on S1.0 that apply to this building,so do not remove the sheet entirely. <br /> Fuel Island Canopy Permit No.: B1903-013 <br /> 6. City of Everett Comment:See Comments 3 through 5 above. These shall also be addressed for this <br /> building. <br /> Response: <br /> KPFF Comments: Same comments as above for Bldg C. <br /> Detail 5/S1.0 and Sheet R12 apply only to the Vault Canopy building; however,there are still details on S1.0 <br /> that apply to this building,so do not remove the sheet entirely. <br /> Vault Canopy Permit No.: B1903-014 <br /> 7. City of Everett Comment:The drawings include the replacement of the roof deck,which appear to provide <br /> the structural diaphragm. The following comments shall be addressed: <br />