My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2020-12-31
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2020-12-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 3:24:15 PM
Creation date
12/31/2020 3:22:37 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
at <br /> • <br /> City of Everett <br /> Development and Construction <br /> Public Works - Permit Services <br /> ve er 14,2019 <br /> Page 2 <br /> 1010.1.9.7 Delayed Egress: <br /> 1. The delay electronics of the delayed egress locking system shall deactivate upon <br /> actuation of the sprinkler system <br /> 2. The delay electronics of the delayed egress locking system shall deactivate upon <br /> loss of power controlling the lock <br /> 3. The delayed egress locking system shall have the capability of being deactivated <br /> at the fire command center. <br /> 4. An attempt to egress shall initiate an irreversible process that shall allow such <br /> egress in not more than 15 seconds when a physical effort to exit is applied to the <br /> egress side door hardware for not more than 3 seconds. Initiation of the <br /> irreversible process shall activate an audible signal in the vicinity of the door. <br /> Once the delay electronics have been deactivated, rearming the delay electronics <br /> shall be by manual means only. <br /> Exemption to #4:Where approved, a delay of not more than 30 seconds is <br /> permitted on a delay egress door. <br /> 5. The egress path shall not pass thru more than one delayed egress system. <br /> 6. A sign shall be provided on the door located above and within 12"of the door exit <br /> hardware. <br /> 6.1 For doors that swing in the direction of egress,the sign shall read: PUSH <br /> UNTIL ALARM SOUNDS. DOOR CAN BE OPENED IN 15 (30) SECONDS. <br /> 6.2 The sign shall comply with the visual character requirements in ICC A117.1. <br /> Summery: <br /> We believe we meet the requirements for a delayed egress door at Door-A. We request <br /> the City of Everett approves this design. <br /> 800()Ctlite_79/ <br /> Douglas McNutt Principal <br /> Encl: See Everett Pharmacy Refresh permit drawings dated 11-14-2019 <br /> C: Bryan Moorman,Project Manager <br /> Jordan Jackson Project Manager, <br /> National Facility Services Kaiser Permanente <br /> R. David Frum, FAIA,ACHA <br /> Z:\18044-EVM Pharmacy Upgrade\Documents\06.00 Agency Reviews\06.10 Municipal\Kaiser Everett Clinic 1st Floor Delayed Egress Door Memo_11-14-2019.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.