Laserfiche WebLink
Fig. 1:Examples of How Far You Could Go at Midday in 15, 30, 45, or 60 Minutes <br /> 201 5 2040 <br /> 30 <br /> ( <br /> Itios <br /> b. <br /> y a <br /> DOWNTOWN BALLARD <br /> Source: King County Metro CONNECTS(2016) <br /> Task 3.1-Everett Transit Long Range Plan <br /> A significant level of effort has already been invested in understanding the dimensions of implementing <br /> the "Growth Network"outlined in the Long-Range Plan. However,there are topics that have arisen <br /> since plan adoption that need to be further investigated and understood.These include the need to <br /> update forecasts of capital and operating cost of incremental growth through 2040 in annual <br /> increments,2020-2040. This will allow consideration of what the fixed route network might look like <br /> when light rail reaches Everett,presently planned for the last time period (Sound Transit is presently <br /> projecting 2036).Some of the detailed issues include: <br /> 1) Capital—defined annually <br /> a) Funding alternatives—What grant funding alternatives and opportunities are realistic and <br /> what might be the magnitude and timing of those? <br /> b) Revisit needs and capacity of a re-constructed,annex,or new Maintenance and Operations <br /> Base <br /> c) Administrative space needs <br /> d) Fleet replacement and expansion including updated assessment of electric bus options <br /> e) Financial participation in Swift Blue line and potential Red line <br /> 2) Operating—defined by the planning milestones,2024 and 2036. <br /> a) Staffing assumptions for operators,supervisors,mechanics,support staff <br /> b) Hours,miles,and fleet estimates foreachfive year period <br /> c) Energy costs—assuming tra nsition to 100%electric <br /> d) Operating cost participation in Swift lines and paratransit"Green Zone" <br /> e) Network changes to adapt to Link extension into Snohomish County and Stride(Sound <br /> Transit's freeway-based Bus Rapid Transit or B RT)implementation on SR-522 and 1-405 <br /> f) Confirmation of ADA Pa ratra ns it operating plan <br /> Page 11 of 17 <br />