My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nelson/Nygaard Consulting Services 12/18/2020 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2021
>
Nelson/Nygaard Consulting Services 12/18/2020 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 12:19:42 PM
Creation date
1/4/2021 12:19:29 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Nelson/Nygaard Consulting Services
Approval Date
12/18/2020
End Date
4/30/2021
Department
Public Works
Department Project Manager
Tom Hingson/Richard Tarry
Subject / Project Title
Rethink Transit Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002289
Total Compensation
$247,898.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3 Planning Scenarios <br /> Task Objectives: <br /> Essentialtothe community outreach and a well-informed Council decision is to ensure there are three <br /> equally defined pathways: <br /> 1.) Move ahead with the adopted Everett Transit Long Range Plan Growth option <br /> 2.) Move ahead with consolidation with Community Transit(the Unified option) <br /> 3.) No action—sales tax rates are not increased <br /> To ensure each alternative is defined so that people have some essential overview of service each <br /> alternative will include for each planning milestone period, 2024 and 2036,a network description and <br /> descriptive statistics,such as miles, hours,buses,service plan,and frequency. Beyond that each <br /> alternative will also be defined by overall metrics of transit mobility in the community including: <br /> • %of Everett population within %mile of transit service <br /> • %of Everett population within %Z mile of high quality1 transit service <br /> • %of Everett priority population within% mile of transit service <br /> • %of Everett priority population within%z mile of high-quality transit service <br /> • %of Everett jobs within % mile of transit service quality frequency transit service <br /> • #of jobs available to Everett residents within 30 minute transit ride <br /> • %of Everett residents with 15 minute reach of Sound Transit service <br /> • %of Everett residents trips to locations outside of Everett that require a transfer <br /> • %of Everett residents living within 1/2-mile of transit with weekend service provided for at least <br /> 12 hours per day, with a maximum 60-min. headway <br /> • Transit travel time reach(see example below) from seven locations within Everett--Everett <br /> Mall,Seaway Transit Center, Everett Station,2 College Station, Mukilteo,Silver Lake,South <br /> Everett Park and Ride (locations subject to further discussion) <br /> Future projections of local and regional population will be taken from PSRC projections and will be held <br /> constant among all three alternatives. <br /> 1 High quality will be defined as part of the project,but will be a combination offrequency at differenttimes of the <br /> day,span of service and days of service. <br /> 2 Project will assume for all future scenarios that Link light rail servicewill terminate at EverettStation. <br /> Page 10 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.