Laserfiche WebLink
4. Sinks (4), faucets (4), and associated plumbing, as necessary to present clean, efficient and <br /> economical appearance/use ... (submittal requirement for owner approval) <br /> 5. Floor covering and improve slope/level as required <br /> 6. Wall tiles; renew with white subway tiles or comparable. (submittal requirement for owner <br /> approval), including proper trim on top course <br /> 7. Paint bright"ceiling white" on ceilings <br /> 8. Paint walls above tile; (subject to owner approval) <br /> 9. Renew lighting fixtures to improve lighting if possible without major electrical work <br /> 10. 1st floor single/family restroom: add waste bin for women's sanitary products, add baby <br /> changing table (wall mounted), remove partitions, do not replace, remove urinal and restore wall. <br /> 11. 2nd floor men's room: -renew urinal with smaller, more modern design <br /> General administrative services to be performed during the Facility Bathroom Improvement project <br /> are: <br /> • Manage project documentation, contract development, and contract compliance <br /> • Manage bid process in coordination with the City and the project architect/engineers, and in <br /> compliance with CBDG requirements <br /> • Facilitate the bid selection process in coordination with the City <br /> • The Dawson Place Child Advocacy Center operations will be open to provide services to child <br /> abuse/neglect victims throughout the project; this will require coordination and communication <br /> between contractors and service providers <br /> • Work directly with project contractor to provide all requested access and information in a <br /> timely manner so that the contractor (sub-contractors) can complete project tasks in an <br /> optimal timeframe. <br /> • Procure funds to cover project expenses not covered by the CDBG funds. <br />