My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berk Consulting Inc. 1/5/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Berk Consulting Inc. 1/5/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 1:06:49 PM
Creation date
1/20/2021 12:56:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Berk Consulting Inc.
Approval Date
1/5/2021
Council Approval Date
12/16/2020
End Date
12/31/2022
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Park, Recreation, and Open Space Plan
Tracking Number
0002734
Total Compensation
$245,830.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Watershed Companyâ– EAlBlumen <br /> June 2012 <br /> Table 4.11-1. City of Everett Park and Recreation Facility Standards <br /> Current LOS Recommended <br /> Facilit T e City CityStandard Surplus/Deficit Surplus/Deficit <br /> y yp (acre or miles/ <br /> Inventory <br /> residents) (acre or miles/ (2006) (2016) <br /> residents) <br /> Neighborhood 73.65 0.7/1,000 1.5/1,000 Need 78 acres Need 92 acres <br /> Park(acres) <br /> Community Park Need 127 Need 144 <br /> 75.63 0.7/1,000 2.0/1,000 <br /> (acres) acres acres <br /> District Parks 302.30 3.0/1,000 2.8/1,000 Exceeds Need 6 acres <br /> (acres) standards <br /> Linear <br /> Parks/Greenway 44.40 0.4/1,000 1.0/1,000 Need 57 acres Need 66 acres <br /> (acres) <br /> Natural/Special <br /> Use Areas 599.48 5.9/1,000 6.2/1,000 Need 28 acres Need 83 acres <br /> (acres) <br /> Paved Trails 16.3 0.16/1,000 0.4/1,000 Need 24 miles Need 28 miles <br /> (miles) <br /> Unpaved Trails 4.9 0.05/1,000 0.1 /1,000 Need 6 miles Need 6 miles <br /> (miles) <br /> Source:City of Everett Parks and Recreation Strategic Master Plan, 2007. <br /> As shown in Table 4.11-1, the City of Everett presently has a deficit in all park <br /> and trail facility types,with the exception of District Parks, and is projected to <br /> have a deficit in all categories by 2016. The Strategic Master Plan included a <br /> service area analysis to assess where specific additional park and recreation <br /> facilities would be needed in the future. The analysis concluded that the <br /> southern portion of the City is in need of additional neighborhood parks,linear <br /> parks/greenways,natural/special use areas, and non-paved trails. In addition, a <br /> facility needs assessment was conducted in the Strategic Master Plan to help <br /> prioritize the facility and amenity needs of the City based on a weighted scoring <br /> system. The facilities that were determined to be the highest priority were,in <br /> order: <br /> 1. Trails for walking and biking; <br /> 2. Indoor swimming pools; <br /> 3. Nature trails and nature center; <br /> 4. Small neighborhood parks; <br /> 5. Indoor fitness and exercise facilities; <br /> 6. Outdoor amphitheater/theater; <br /> 7. Outdoor swimming pool/leisure pools; and, <br /> 8. Indoor recreation center <br /> The Strategic Master Plan established specific visions, goals and strategies for the <br /> Parks Department over the next ten years, including the following that would be <br /> applicable for the Replacement Site: <br /> Page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.