My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berk Consulting Inc. 1/5/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Berk Consulting Inc. 1/5/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 1:06:49 PM
Creation date
1/20/2021 12:56:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Berk Consulting Inc.
Approval Date
1/5/2021
Council Approval Date
12/16/2020
End Date
12/31/2022
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Park, Recreation, and Open Space Plan
Tracking Number
0002734
Total Compensation
$245,830.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Example Plan: South Everett Forest Preserve Master Plan (Attachment C) <br /> Maintenance and asset management is integral to sustainable capital facilities planning and Perteet <br /> included maintenance and asset management considerations into the S. Everett Forest Preserve Master <br /> Plan. Maintenance management considerations for the park were evaluated including efficiency <br /> recommendations for park structures and materials. An environmental analysis was also completed, <br /> inclusive of a wetland and stream assessment and with vegetation management recommendations to <br /> obviate the need for pesticide usage and to utilize earth-friendly practices. Maintenance considerations <br /> were integrated into the design goals to develop a park that is cost effective and takes into <br /> consideration long-term maintenance and operation of facilities, to address crime prevention goals, and <br /> also in consideration of life cycle costs of park improvements. The plan was prepared to address the <br /> conclusions of a prior NEPA EA that identified that a lack of public and operational access to the site was <br /> a hinderance to maintenance and public safety. A vegetation management and native vegetation <br /> restoration plan was also prepared under this effort (Master Plan Page 17 and 18) to address removal <br /> of invasive plant species and to establish low-maintenance native vegetation suitable for a park in the <br /> context of forested wetlands and buffers, and directly adjacent to Silver Lake Creek. We understand <br /> the maintenance plan prepared for the PROS effort would further define the maintenance actions and <br /> frequency of maintenance of the site features implemented for this park (e.g. kiosk, picnic table, benches, <br /> vault trash receptacle, trail surfacing, and vegetation management pursuant to Crime Prevention through <br /> Environmental Design standards). <br /> Please see Attachment C: Example Park Maintenance Management Plan. <br /> 8. Provide references and contact information for Jason Hennessy's park impact fee past <br /> projects. <br /> Can also be found on slide 24 of our presentation materials (Attachment A). <br /> The following references are for recent parks impact fee work completed by Jason Hennessy. <br /> ■ City of Mountlake Terrace: Jeff Betz, Recreation & Parks Director, (425) 640-3101, <br /> JBetz@ci.mlt.wa.us <br /> ■ Thurston County: Kerry Hibdon, Parks Manager, (360) 867-2181, hibdonk@co.thurston.wa.us <br /> ■ Pierce County: Kimberly Freeman, Resource Stewardship Superintendent, (253) 798-4009, <br /> kimberly.freeman C1 piercecountywa.gov <br /> ■ City of Seattle: Brennon Staley, Strategic Advisory, (206) 684-4625, Brennon.Staley@seattle.gov <br /> ■ City of Anacortes: Bob Vaux, Assistant Director— Parks & Recreation, (360) 293-1 91 8, <br /> bobv@cityofanacortes.ora <br /> City of Everett I PROS Plan Update—Interview Response 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.