Laserfiche WebLink
12/16/2020 <br /> Change Order No.1 -Fire Administration Building-Tenant Improvements Exhibit A <br /> No. Construction Change Directives Amount Change Order <br /> 1 Local Moving with Bekins NW-Moving Cost $ 9.438.15 CO 001 <br /> 2 Replace existing door No.201 to match new doors being installed $ 2.369 80 CO 003 <br /> 3 Provide electrical,plumbing and drinking fountain at 1st floor S 5.440 64 CO 004 <br /> 4 Install Emergency Electrical Generator Connection&Manual Transfer Switch S 47,805.86 CO 005 <br /> 5 Add layer of Gypson Wall Board at cracked plaster walls on 2nd floor $ 5,669.11 CO 006 <br /> 6 Replace Carpet Tiles with LVT Flooring in selected rooms $ 16.914 22 CO 007 <br /> Main stair flooring work spaces 113& 106,and office space 104 stairs Relpace <br /> 7 with rubber non-slip flooring $ 11,917.53 CO 008 <br /> 8 Add steel stanchion posts to support pony walls S 1.403 35 CO 009 <br /> 9 Add Fire Dept.requested revised electrical power and data drops S 33.646.72 CO 011 <br /> 10 Relocate 2 existing light fixtures to North,includes changing to LED type S 2.284.34 CO 012 <br /> 11 Addrinstall LED track lighting in hall way S 5.200 03 CO 016 <br /> 12 Add new 30'flag pole $ 7.836 33 CO 018 <br /> No. Kirtley-Cole Associates,LLC.Change Proposals Amount <br /> 1 Unforseen condition Asbestos Abatement S 9.350.77 CO 002 <br /> 2 Exit sign type change-Credit $ (1.778 97) CO 010 <br /> 3 Unforseen Condition-Existing plaster walls-Door openings and tie-ins S 16.422.17 CO 013 <br /> 4 Unforseen Condition-West Elevation Window-Drywall Returns make uniform $ 8 829.70 CO 014 <br /> 5 Unforseen Condition-Cracked plaster ceiling repairs $ 7 6119.50 CO 015 <br /> Total $ 190,569.25 <br />