Laserfiche WebLink
PI <br /> engineering p c <br /> Refer to Figure 5—Proposed Conditions and the Permanent Stormwater Control Plan in Section <br /> VIII of this report for additional details. <br /> Performance Standards and Goals <br /> Figures 2.1 and 2.2 from the 2010 City of Everett Stormwater Management Manual were used to <br /> determine which minimum requirements apply to the project. <br /> CITY OF EVERETT STORMWATER MANAGEMENT MANUAL <br /> Start Here <br /> Does the project have <br /> 5,000 square feet or <br /> more of new, replaced, —) See Minimum Requirement#6 <br /> or new plus replaced <br /> pollutant generating Yes <br /> impervious surface'? <br /> No Next Question <br /> V <br /> Does the project <br /> convert 3/4 acres or Does the project have <br /> Does the project add more of native 2,000 square feet or <br /> 5,000 square feet vegetation to lawn or more of new, <br /> or more of new °' landscaped areas,or —i <br /> impervious surfaces? convert 2.5 acres or replaced, new plus <br /> No No replaced impervious <br /> more of native surfaces? <br /> vegetation to pasture? <br /> 'hies'- Yes Yes No <br /> • <br /> Does the project <br /> See Minimum See Minimum have land- <br /> Requirements#1 Requirements#1 disturbing <br /> 7, <br /> through#9 through#5 activities feet 7,000 <br /> Yes square or <br /> more? <br /> Note:For new <br /> impervious surfaces. No <br /> See Minimum <br /> Requirement#2 <br /> Figure 2.1 Flow Chart for Determining Requirements for New Development and Redevelopment <br /> Volume 1–Minimum Technical Requirements <br /> 2-4 <br /> LPD Engineering, PLLC Page 3 Mukilteo School District Teaching and Learning Center <br /> Stormwater Site Plan,July 22, 2014; Revised August 25, 2014 <br />