Laserfiche WebLink
IPD <br /> engineering plic <br /> Figure 2.1 was used to determine which minimum requirements apply. The project does not have <br /> more than 5,000 of new plus replaced pollution generating impervious surface therefore minimum <br /> requirement#6 does not apply. However,the project does include more than 5,000 square feet of <br /> new impervious surface,therefore minimum requirements#1 through#5,and#7 through#9 apply <br /> to this project. <br /> CITY OF EVERETT STORMWATER MANAGEMENT MANUAL <br /> Start Here <br /> Does the site have 35%or No No additional <br /> more of existing impervious N. requirements for <br /> coverage? redevelopment apply <br /> Yes` <br /> Is the total of the new plus replaced <br /> impervious surfaces 5000 square feet or <br /> [sthisartLiatedmore,AND does the value of the proposed <br /> Pro d-r j improvements—including interior <br /> improvements—exceed 50%of the assessed <br /> value of the existing site improvements? <br /> Yes <br /> Does the project add <br /> 5,000 sq ft or more of <br /> new impervious No 112, Yes <br /> surfaces? <br /> Yes <br /> Do new impervious <br /> surfaces add 50%or more No No additional <br /> to the existing impervious requirements for <br /> surfaces within the project redevelopment apply <br /> limits? <br /> Yes <br /> • <br /> See Minimum Requirements <br /> #1 through#9 <br /> Figure 2.2 Flog ('hart for Determining Additional Requirements for Redevelopment <br /> Volume I—Minimum Technical Requirements <br /> 2-5 <br /> LPD Engineering, PLLC Page 4 Mukilteo School District Teaching and Learning Center <br /> Stormwater Site Plan,July 22, 2014; Revised August 25, 2014 <br />