My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9600 SHARON DR EXPLORER MIDDLE SCHOOL 2016-05-27
>
Address Records
>
SHARON DR
>
9600
>
MSD TEACHING AND LEARNING CENTER
>
9600 SHARON DR EXPLORER MIDDLE SCHOOL 2016-05-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 3:55:58 PM
Creation date
5/27/2016 10:52:21 AM
Metadata
Fields
Template:
Address Document
Street Name
SHARON DR
Street Number
9600
Tenant Name
MSD TEACHING AND LEARNING CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br /> engineering p c <br /> IV. CONSTRUCTION STORMWATER POLLUTION PREVENTION <br /> PLAN <br /> The Construction Stormwater Pollution Prevention Plan(CSWPPP)is a combination of the <br /> Temporary Erosion and Sediment Control(TESC)Plan and a narrative.The TESC Plans are <br /> provided in the Design Drawings. The narrative is included in Appendix B. <br /> V. SOURCE CONTROL PLAN <br /> The following activities identified in Volume IV of the 2010 City of Everett Stormwater <br /> Management Manual apply to this project: <br /> • A2.1 Loading and unlading of liquid or solid material <br /> • A3.2 Concrete Pouring, Concrete Cutting, and Asphalt Application at Temporary Sites <br /> • A3.6 Landscaping and Vegetation Management Activities, Including Vegetation Removal, <br /> Herbicide and Insecticide Application,Fertilizer Application,Irrigation,Watering, <br /> Gardening, and Lawn Care. <br /> • A4.4 Storage of Solid Wastes and Food Wastes <br /> • A4.9 Parking and Storage for Vehicles and Equipment <br /> • A5.2 Building Repair,Remodeling, and Construction <br /> A full list of BMPs for each activity class is provided in Appendix C along with the activity <br /> worksheet. <br /> VI.SPECIAL REPORTS AND/OR STUDIES <br /> The geotechnical report is available under separate cover upon request. <br /> VII.OTHER PERMITS <br /> Other permits applicable to this project include Washington State Department of Ecology State <br /> Waste Discharge General Permit for Stormwater Discharges Associated with Construction Activity <br /> (Construction Stormwater General Permit, or CSWGP). <br /> VIII.PERMANENT STORMWATER CONTROL PLAN <br /> A. Off-site Analysis <br /> A site visit was conducted on July 6,2014 to verify the onsite conditions, evaluate the downstream <br /> drainage paths,and determine any upstream tributary areas to the site.The weather during the site <br /> investigation consisted of overcast sky and an approximate temperature of 65 degrees Fahrenheit. <br /> Western Threshold Discharge Area <br /> Drainage within the project limits tributary to the western threshold discharge area(TDA)sheet <br /> flows from theproject area to the northwest towards Walter Hall Golf Course(private property). <br /> Through on-site observations the flow path appears to continue sheet flowing to the northwest <br /> LPD Engineering, PLLC Page 6 Mukilteo School District Teaching and Learning Center <br /> Stormwater Site Plan,July 22, 2014; Revised August 25, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.