Laserfiche WebLink
• <br /> • nKLEINFELDER <br /> • <br /> • 6 LIMITATIONS <br /> • <br /> • <br /> • <br /> This pavement study has been prepared for the exclusive use of MG2 and their agents for <br /> • specific application to the proposed AMZL DWS5 Warehouse Improvements project located at <br /> 6617 Associated Boulevard in Everett, Washington. The findings, conclusions and <br /> • recommendations presented in this report were prepared in accordance with generally accepted <br /> •• geotechnical engineering practice. No other warranty, express or implied, is made. <br /> • <br /> The scope of services was limited to a background data review and our current field exploration. <br /> • It should be recognized that definition and evaluation of subsurface conditions are difficult. <br /> •• Judgments leading to conclusions and recommendations are generally made with incomplete <br /> • knowledge of the subsurface conditions present due to the limitations of data from field studies. <br /> The conclusions of this assessment are based on our field exploration and laboratory testing <br /> • programs, and engineering analyses. <br /> • <br /> • Kleinfelder offers various levels of investigative and engineering services to suit the varying <br /> • needs of different clients. Although risk can never be eliminated, more detailed and extensive <br /> • studies yield more information, which may help understand and manage the level of risk. Since <br /> • detailed study and analysis involves greater expense, our clients participate in determining <br /> • levels of service, which provide information for their purposes at acceptable levels of risk. The <br /> • client and key members of the design team should discuss the issues covered in this report with <br /> • Kleinfelder, so that the issues are understood and applied in a manner consistent with the <br /> • owner's budget, tolerance of risk and expectations for future performance and maintenance. <br /> • Recommendations contained in this report are based on our field observations and subsurface <br /> • explorations, limited laboratory tests, and our present knowledge of the proposed construction. <br /> • It is possible that soil or groundwater conditions could vary between or beyond the points <br /> • explored. If soil or groundwater conditions are encountered during construction that differ from <br /> • those described herein, the client is responsible for ensuring that Kleinfelder is notified <br /> • immediately so that we may reevaluate the recommendations of this report. If the scope of the <br /> • proposed construction changes from that described in this report, the conclusions and <br /> • recommendations contained in this report are not considered valid until the changes are <br /> • reviewed, and the conclusions of this report are modified or approved in writing, by Kleinfelder. <br /> • <br /> • 20203884.001A/SEA20R110164 Page 25 of 28 June 1, 2020 <br /> ©2020 Kleinfelder <br /> • <br />