|
•
<br /> CONSTRUCTION DOCUMENTS (continued)
<br /> N. Northwest Energy Efficiency Council Worksheets to show compliance with Washington
<br /> State Energy Code, including drawing details and summary of enclosure requirements.
<br /> O. Structural drawings and calculations to include design loads, material specifications and
<br /> structural schedules, including seismic analysis, if applicable.
<br /> P. Copies of any permits/approvals issued by the Planning Department.
<br /> Q. High-piled combustible storage (if applicable). Plans and specifications submittal per
<br /> Chapter 23, Section 2301.3, IFC.
<br /> R. Hazardous materials (if applicable). Hazardous materials management plans and
<br /> inventory statements per Section 407, IFC, and Tables 307.7(1) and 307.7(2), IBC.
<br /> S. Multifamily Worksheet for any multifamily construction project. Architect's enclosure
<br /> details with certification or Sales Prohibition Covenant required (RCW 64.55).
<br /> II. SITE PLANS
<br /> A. Legal description, north arrow, horizontal dimensions indicating property lines, streets,
<br /> alley easements, building location and dimensions, dimensioned driveway approaches,
<br /> sidewalks, parking and aisles.
<br /> B. Details of curb cut or ramp plans with dimensions (1/4" = 1' minimum scale).
<br /> C. Guard, handrail sections and elevations indicating materials, dimensions, and
<br /> construction details along the egress path.
<br /> D. Existing and new grades, ramps, stairs, rockeries and retaining walls.
<br /> E. Indicate setbacks from any lakes, streams, bays, wetlands or other natural body of
<br /> water within 100 feet of site.
<br /> F. Accessible parking, access aisles, signage, and accessible route to the building clearly
<br /> dimensioned and detailed, including door entrance.
<br /> III. CIVIL PLANS
<br /> A. Plans showing utilities (electrical, gas, storm, sanitary, fire service, domestic water)
<br /> including all of the items required on the site plan.
<br /> B. Double check detector assembly and access. PIV and other fire department access
<br /> requirements.
<br /> C. Street improvement plans as required by SEPA or City ordinance.
<br /> D. Plans indicating how grading and erosion control issues are resolved.
<br /> APPLICABLE CODES AND REFERENCES
<br /> • Automatic Fire Detection &Suppression Systems Ordinance No. 1902-92
<br /> • International Building Code (IBC), 2015 Edition &WAC 51-50
<br /> • International Existing Building Code (IEBC), 2015 Edition &WAC 51-50
<br /> • Accessible and Usable Buildings & Facilities, ANSI A117.1-2009 &WAC 51-50-005
<br /> • International Fire Code (IFC), 2015 Edition &WAC 51-54
<br /> • International Mechanical Code (IMC), 2015 Edition &WAC 51-52
<br /> • National Electrical Code (NEC), 2014 Edition &WAC 296-46B-010
<br /> • Uniform Plumbing Code (UPC), 2015 Edition &WAC 51-56 & 51-57
<br /> • Washington State Energy Code (WSEC), 2015 Edition, WAC 51-11 (C, R, Appendix)
<br /> • City of Everett Design &Construction Standards&Specifications
<br /> • Everett Stormwater Management Manual
<br /> • Everett Municipal Code, Title 19 Zoning
<br /> ChkIst2015-Comm(rev 8/16)
<br /> CITY OF EVERETT BUILDING DEPARTMENT 3200 CEDAR ST, EVERETT, WA 98201 425-257-8810
<br /> website:www.everettwa.gov/permit email:everettepsc ..everettwa.gov
<br /> � I�
<br />
|