My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8417 EVERGREEN WAY 2022-05-23
>
Address Records
>
EVERGREEN WAY
>
8417
>
8417 EVERGREEN WAY 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 7:28:37 AM
Creation date
1/28/2021 9:01:05 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8417
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br /> 27.The response is not sufficient.The response has only addressed the portion of the comment regarding post-installed <br /> anchorage. Calculations for the design of the cast-in holdown anchors shall be submitted for review per the criteria <br /> stated in the original comment. <br /> 31.The response is not clear.The structural calculations appear to provide conflicting designs.The comment shall clarify <br /> the design intent of both pages 71 and 80. <br /> 32.The response is not clear.The response does not appear to address the comment, including referencing joists <br /> instead of the roof trusses. <br /> 33.The response is not clear and should be revised to clearly indicate how it addressed the comment. <br /> 35.The response is not sufficient.The following shall be addressed: <br /> a.The referenced calculations pages 100b through 100d have not been provided. <br /> b.The response states that wind controls the design.This does not appear likely given that the heaviest units weight up <br /> to 1,500 lbs. <br /> c. Deails for supplemental framing and anchorage have not been provided. <br /> 36.The response is not sufficient.The response references the response to Comment 35,which does not address <br /> Comment 36. <br /> 40. Detail 5/S-1.2 still shows the framing as metal stud walls"by others".These walls are not included in the deferred <br /> submittal on Sheet S-1.0. In addition, it is noted that Details 11/S1.3, referenced on Sheet S-2.0, and 9/S-1.1 and C/S-3.1, <br /> referenced on Sheet S-2.1, all indicate the interior walls to be wood-framed construction. <br /> Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> LiAssociate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8813 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Hours: Monday—Friday 7:30am-12:00pm and 1:00pm-4:00pm <br /> everettwa.gov I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 2 /CG <br />
The URL can be used to link to this page
Your browser does not support the video tag.