Laserfiche WebLink
PERTEET <br /> MEMORANDUM <br /> River from running on to the site—this will prevent stormwater runoff from flowing offsite to the east. <br /> Addition of fill should not result in increased runoff from site so this should be okay. Noted. <br /> 5. Drawing No. NT2—Include note about preventing ponded water on landfill cover. Note added on NT2 <br /> ("Wet Weather Handing And Placement Of Common Borrow"note 2). <br /> Everett Riverfront—Simpson Site Phase 3 Preload Removal Simpson Site SWPPP preparer has modified the <br /> SWPPP accordingly. <br /> 1. Section 3.1.2—Phase 3 area is not indicated on plans—construction access should be to Phase 3 section <br /> not at main access to site which is now paved. Update Plan Sheet C2.01 and C2.03. How is wash water <br /> being controlled on site? <br /> 2. Section 4.0—Missing a sentence in 5.Schedule—last two dates should be in 2019. <br /> 3. Plan Sheets—No detail sheet is provided for swale and infiltration sump. <br /> e4/ ! <br /> File location:\\evt-files\clients\Polygon-Shelter Holdings\Projects\20180004-Evt Riverfront Devolp T&M\Submittals\2018-04-13 SP <br /> Resubmittal\Everett Riverfront Devolp T&M_Comment Response Memo 04-13-18.docx <br />