My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2021-01-28
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2021-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2021 3:48:13 PM
Creation date
1/28/2021 3:37:54 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
649
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Stormwater Pollution Prevention Plan <br /> 4.0 Construction Phasing and BMP <br /> Implementation <br /> Refer to the Erosion Control Plans enclosed within Appendix A of this Report for the <br /> Construction Sequence, and the summary shown below. <br /> 1. Schedule and attend a preconstruction conference with the City of Everett. <br /> 2. Flag the limits of clearing in for sediment trap construction, install/repair filter fabric <br /> fence where shown on the plans. Install either 42" orange safety fence or filter fabric <br /> fence along all other limits of clearing where filter fabric fence is not delineated. <br /> 3. Construct the temporary rock-lined construction entrance <br /> 4. Construct the sediment traps <br /> 5. Install inlet filters upon existing CBs. Begin grading while extending temporary <br /> eri thte r . d as pt <br /> 6. Stabilizeintercptor all swales.areas oncBe final e gradessito aresubg establishedadeHydrosee by suitableas applicationsoon rac <br /> ofical.BMP's by <br /> hydroseed, sod, or similar method. <br /> 7. Remove erosion control facilities except inlet filters (only when approved by City of <br /> Everett Inspector). <br /> 8. Temporary BMP's can be removed only after project is complete and risk of silt laden <br /> water leaving the site has passed. <br /> The BMP implementation schedule will be driven bythe construction schedule. The following <br /> provides a sequential list of the proposed construction schedule milestones and the corresponding <br /> IBMP implementation schedule. The list contains key milestones such as wet season <br /> construction. <br /> The BMP implementation schedule listed below is keyed to proposed phases of the construction <br /> project, and reflects differences in BMP installations and inspections that relate to wet season <br /> construction. The dry season is considered to be from May 1 to September 30 and the wet <br /> season is considered to be from October 1 to April 30. <br /> I . Estimate of Construction start date: 2/5/18 <br /> • Estimate of Construction finish date: 9/1/2018 <br /> I . Mobilize equipment on site: 2/5/18 <br /> • Mobilize and store all ESC and soil stabilization products <br /> (store materials on hand BMP C150): 2/5/18 <br /> ■ Install ESC measures: 2/12/18 <br /> I . Install stabilized construction entrance: 2/12/18 <br /> • Begin grading activity: 2/14/18 <br /> I <br /> I13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.