Laserfiche WebLink
I <br /> Stormwater Pollution Prevention Plan <br /> • Begin implementing soil stabilization and sediment <br /> control BMPs throughout the site in preparation for wet <br /> season: 9/30/2018 <br /> • Wet Season starts: 10/1/2018 <br /> ■ Site inspections and monitoring conducted weekly and <br /> for applicable rain events as detailed in Section 6 of this <br /> ISWPPP: 10/1/2018 <br /> ■ Implement Element#12 BMPs and manage site to <br /> minimize soil disturbance during the wet season 10/1/2018 <br /> ■ Dry Season starts: 5/1/2019 <br /> I . Begin implementing soil stabilization and sediment <br /> control BMPs throughout the site in preparation for wet <br /> season: 9/30/2019 <br /> 1 <br /> I <br /> I <br /> I <br /> 1 <br /> i <br /> 1 <br /> I <br /> I <br /> I <br /> 14 <br />