Laserfiche WebLink
I <br /> Storm water Pollution Prevention Plan <br /> Appendix F: SWPPP Amendment Log <br /> I <br /> Instructions (see CGP Part 7.4): <br /> — Create a log here of changes and updates to the SWPPP. You may use the table below to track these modifications. <br /> — SWPPP modifications are required pursuant to CGP Part 7.4.1 in the following circumstances: <br /> ✓ Whenever new operators become active in construction activities on your site, or you make changes to your <br /> construction plans, stormwater control measures, pollution prevention measures, or other activities at your site <br /> that are no longer accurately reflected in your SWPPP; <br /> ✓ To reflect areas on your site map where operational control has been transferred (and the date of transfer) <br /> since initiating permit coverage; <br /> ✓ If inspections or investigations determine that SWPPP modifications are necessary for compliance with this <br /> permit; <br /> ✓ Where EPA determines it is necessary to impose additional requirements on your discharge; <br /> and <br /> ✓ To reflect any revisions to applicable federal, state,tribal,or local requirements that affect the stormwater <br /> control measures implemented at the site. <br /> — If applicable, if a change in chemical treatment systems or chemically-enhanced stormwater control is made, including use <br /> of a different treatment chemical,different dosage rate, or different area of application. <br /> I <br /> I <br /> No. Description of the Amendment Date of Amendment Prepared by <br /> Amendment [Name(s) and Title] <br /> I • <br /> I <br /> I <br /> I <br /> I <br /> I <br />