Laserfiche WebLink
• <br /> Ms.Sabrina Fandler,PE <br /> May 21,2018 <br /> 2170746.10 <br /> aFT <br /> iii. Sheet C3.0(4 of 10) <br /> Response: <br /> a. The contours have been updated to reflect the curbs. <br /> b. The references to the standard details have been added to the plans. <br /> iv. Sheet C3.2(6 of 10) <br /> Response: The updated.details have been added to the plans. <br /> v. Sheet C4.0(7 of 10)—Install either a DCVA(if warehouse)or RPBA(if <br /> manufacturing)on domestic line, inside building, depending on the intended <br /> use of the building. Manufacturing is considered high-hazard, so if there is <br /> to be any amount of manufacturing, it should be an RPBA. See additional <br /> redlines as well. <br /> Response: <br /> a. The connection points have been added to the plans. <br /> b. The 45-degree bends have been added to the plans. <br /> c. The RPBA and DCDA have been called out on the plans and the <br /> details added. <br /> d. The two notes have been added to the plans. <br /> e. The location of the FDC has been updated per the comments. <br /> f. The landscape plantings are now shown on the utility plans. <br /> Landscaping has been located to avoid conflicts with any utilities. <br /> Additionally, the sewer and water utilities have been added to the <br /> Landscape Plans. <br /> vi. Sheet L5.2(3 of 12) <br /> Response: The noted plant has been moved. <br /> vii. Sheet L6.0 (7 of 12) <br /> Response: The landscape plantings are now shown on the utility plans. <br /> Landscaping has been located to avoid conflicts with any utilities. <br /> Additionally,the sewer and water utilities have been added to the <br /> Landscape Plans. <br /> 2. The comments below were generated from this project's Stormwater Reviewer. If you <br /> have any questions regarding these comments, please contact Erik Emerson with the <br /> City of Everett Surface Water Division(425-257-8995 or EEmerson@everettwa.gov). <br /> R H 011 <br />