My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 1100 - 3 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> 5. Dredging (with Contractor supplied dredge), and dewatering of 2,000 dry <br /> tons of biosolids. <br /> 6. Managing dewatered biosolids on site. <br /> 7. Loading, weighing, and transporting dewatered biosolids to the designated <br /> area on City's Biosolids Pad. <br /> 8. Decontamination of Equipment at WPCF Biosolids Pad prior to <br /> transportation to WFP. <br /> 9. City approval of Decontamination efforts. <br /> 10. WPCF Biosolids Pad site cleanup and restoration. <br /> 11 . Mobilization to WFP. <br /> 12. Making temporary connections to utilities. <br /> 13. Dredging (with Contractor supplied dredge), and dewatering of 400 dry tons <br /> of backwash solids. <br /> 14. Managing dewatered backwash solids on site. <br /> 15. Loading, weighing, and transporting dewatered backwash solids to the <br /> designated area on the City's Drying Bed. <br /> 16. WFP site cleanup and restoration. <br /> 17. Demobilization <br /> C. Work under the Contract shall also include: <br /> 1. Sampling in a representative manner, storing samples according to <br /> sampling protocols, and submitting samples for analysis as required by <br /> Owner. <br /> 1.3 ADDITIONS TO, OR DEDUCTIONS FROM, THE CONTRACT <br /> A. The authorization of all Additions to, or Deductions from, labor and materials, as <br /> called for in the Contract, shall be given only upon the Owner's printed change <br /> order form bearing the signatures of the Owner, the Contractor, and the <br /> Architect/Engineer. <br /> 01 1100 - 3 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.