Laserfiche WebLink
City of Everett 01 2213 - 4 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> f. Owner reserves the right to reject applications for payment if: <br /> 1) Submittal of scale tickets and sample data are not submitted in <br /> a timely manner. <br /> 2) Total Solids of any mass of biosolids fails to meet the minimum <br /> specifications. <br /> D. Item #4 — FORCE ACCOUNT FOR WORK AT WPCF <br /> 1. Measurement will be negotiated prior to commencing any such work under <br /> this pay item and shall be for work to remedy unforeseen conditions. <br /> 2. Payment or credits for changes amounting to $10,000 or less may be <br /> made under the Bid Item FORCE ACCOUNT. At the discretion of the City, <br /> this procedure for Force Account may be used in lieu of the more formal <br /> procedure outlined in the General Conditions 00 7200, Section 9.6. <br /> 3. The agreement for Force Account will be documented by signature of the <br /> Contractor. If the Contractor is in disagreement with anything required by <br /> the order for Force Account, the Contractor may protest as provided in the <br /> General Conditions. <br /> 4. Payments or credits will be determined in accordance with the General <br /> Conditions Section 9.6. For the purpose of providing a common Proposal <br /> for all Bidders, the City has entered an amount for FORCE ACCOUNT in <br /> the proposal to become past of the total Bid by the Contractor. <br /> E. Item #5 — DECONTAMINATION OF EQUIPMENT FOR WORK AT WFP <br /> 1. The decontamination requirement covers all aquatic vessels, machinery, <br /> and equipment that are new or have been previously used outside Everett <br /> water supply watersheds, or have been moved between watersheds <br /> owned by Everett, and will be used for work in any surface water body in <br /> Everett's watersheds. The level of decontamination will depend on <br /> previous use, transportation, and history log. See Section 01 7400 <br /> Invasive Species Equipment Decontamination for full requirements. <br /> 2. Payment for decontamination shall be paid as a lump sum. <br /> F. Item #6 — DRY TONS BACKWASH SOLIDS REMOVED, DEWATERED, AND <br /> PLACED ON WFP DRYING BED (Unit Price) <br /> 1. For the purposes of this Contract, the Contractor shall be paid the unit <br /> price bid for Dry Tons per the amount (by weight) of solids material that is <br /> 01 2213 - 4 UNIT PRICE MEASUREMENT <br />