My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2213 - 5 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> weighed and transported from the dewatering staging area to the <br /> designated location on the City's Backwash Solids Pad. <br /> 2. For this contract, the measurement of a Dry Ton includes the weight of <br /> only the solid material contained in each ton of material that crosses the <br /> City owned scale — the weight of the water will not be included. <br /> 3. Contractor shall weigh each truck prior to and after placing solids on the <br /> Pad, using the certified scale provided by Owner. <br /> 4. The calculation of a Dry Ton for payment shall be as per the following <br /> equation and examples: <br /> (Tons of material loaded into a truck) x (Percent TS) <br /> 100 = Dry Tons <br /> Example 1 (Material at 18% TS): <br /> (2 tons of material loaded into a truck) x (18%) <br /> 100 = 0.36 tons of Dry Ton <br /> material for payment. <br /> Example 2 (Material at 22% TS): <br /> (10 tons of material loaded into a truck) x (22%) <br /> 100 = 2.2 tons of Dry Ton <br /> material for payment. <br /> 5. Payment <br /> a. All labor, equipment, tools, materials, and necessary appurtenances <br /> required to dredge the backwash solids from the Backwash Pond <br /> and necessary to dewater these backwash solids to a solids content <br /> of equal to or greater than 18% TS shall be incidental to the payment <br /> for each Dry Ton. <br /> b. Payment for labor, equipment, tools, and materials necessary for <br /> loading, moving, weighing, transporting, and depositing the material <br /> in the designated area on the City's Backwash Solids Drying Bed <br /> shall also be incidental to the payment for each Dry Ton. <br /> c. Contractor shall provide a composite sample from each truckload <br /> hauled across the scale. Individual truck samples taken will be <br /> combined by the City on a daily basis to form a daily composite <br /> sample, which will be tested to determine the average percent solids <br /> for the day. This average percentage shall be applied to the daily <br /> 01 2213 - 5 UNIT PRICE MEASUREMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.