My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2600 - 1 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> SECTION 01 2600 - CONTRACT MODIFICATION PROCEDURES <br /> 1.1 SUMMARY OF MODIFICATIONS PROCEDURES <br /> A. Changes to the Work may be required due to field conditions, requests made by <br /> the Owner, clarifications to the bid documents, or other needs that result in a <br /> change in the cost of the work and/or change in the number of contract days per <br /> 00 7200 General Conditions, Article 6. The changes to the work will be tracked <br /> individually as Request for Change Proposals (RFCP). Request for Change <br /> Proposals may either be prepared as a Field Directive, or as a request for pricing <br /> prior to proceeding with the work. <br /> B. A change order will be issued for one or more RFCP's grouped into a single <br /> change order. Payment for changed work cannot be paid until the change order <br /> is finalized and approved as outlined per 00 7200 General Conditions, Article 6. <br /> C. The Request for Change Proposal shall clearly identify all labor, material, <br /> equipment, and incidentals, including subcontractor's and supplier's invoices or <br /> quotes as well as Contractor's timecards. A reference from the latest approved <br /> schedule shall be attached justifying any time extension request. Mark ups for <br /> all overhead, profit, bond cost, B & 0 taxes, and insurance shall be added per 00 <br /> 7200. The form included at the end of this section will be used for directing the <br /> work to be done in one of the two manners described below. <br /> D. Contractor, and Subcontractors where required, shall provide a breakdown of <br /> labor costs including basic wage rates, fringe benefits, FICA, FUTA and SUCA <br /> add-ons, per 00 7200 General Conditions. Where premium time is involved, the <br /> Contractor shall provide a breakdown of costs in the same detail. <br /> 1.2 FIELD DIRECTIVE MODIFICATION PROPOSALS <br /> A. Changed conditions and/or unanticipated circumstances may require immediate <br /> revisions to Work which are essential and from which a delay would result in a <br /> time and or cost penalty to the project. When such a condition exists, the Owner <br /> shall issue a written Field Directive to the Contractor. <br /> B. The Owner will provide direction for the Contractor identifying the necessary <br /> changes to be made. The Field Directive shall be identified with a Request for <br /> Change number. The Contractor will provide pricing per 1.1 of this section within <br /> 15 days of the completion of the work. <br /> 01 2600 - 1 CONTRACT MODIFICATION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.