My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2600 - 2 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> 1.3 LUMP SUM MODIFICATION PROPOSALS <br /> A. The Owner may request priced proposals which either add or delete work prior <br /> to proceeding with any changes. <br /> B. When requested, the Contractor shall provide pricing per 1.1 of this section for <br /> review and approval by the Owner, prior to proceeding with the work. <br /> 1.4 CHANGE ORDERS <br /> A. A change order to the work will be issued including one or more Request for <br /> Change Proposals. The cumulative amount of adds and deducts along with the <br /> change in the number of days approved in each individual RFCP shall be added <br /> to or deducted from the Contract. The change order shall incorporate the RFCP <br /> forms, and all required back up documentation into a lump sum contract <br /> adjustment. <br /> B. The payment for work performed under the change order cannot be made until <br /> the change order has been signed and approved as per 00 7200 General <br /> Condition, Article 6. <br /> C. If an individual change order exceeds 10% of the original contract amount and is <br /> over $50,000, a special review may be required by the Owner. <br /> END OF SECTION 01 2600 <br /> 01 2600 - 2 CONTRACT MODIFICATION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.