My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3216 - 1 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> SECTION 01 3216 - CONSTRUCTION PROGRESS SCHEDULE <br /> 1.1 CONSTRUCTION SCHEDULE <br /> A. The Contractor shall prepare a construction schedule showing all tasks required <br /> to perform the work. Schedule shall show all tasks performed by all trades that <br /> is required to perform work within the contract time. The Schedule shall include <br /> sufficient time for cleaning, punch list review, and completion of punch list items <br /> prior to the designated physical completion date. <br /> 1.2 FORMAT <br /> A. The Schedule shall be a critical path method of Gantt chart style. <br /> B. The Schedule shall clearly identify all work and detailed to show specific steps to <br /> perform work. The relationship between the work items shall show the starting <br /> date, length of time required to perform work, completion of the work within the <br /> time frame shown. <br /> C. All work found on the schedule of values shall be clearly identified. Unless <br /> otherwise expressly authorized in writing by the City's representative, the <br /> Contractor must integrate the schedules with the Schedule of Values and unit <br /> price items so that each construction activity is represented by a dollar value. <br /> D. Submittals dates shall be included and the relationship between submittal and <br /> the work item shall be identified <br /> E. Materials requiring long lead times shall be clearly identified on the schedule. <br /> This shall include: <br /> 1. Date materials musts be ordered <br /> 2. Time for manufacturing <br /> 3. Time for delivery <br /> 4. Delivery date (expected date materials to be at the project) <br /> 5. Date of Installation <br /> 1.3 SUBMITTAL <br /> A. At the pre-construction meeting, a preliminary schedule is required to be <br /> submitted. Once the preliminary schedule has been approved, the schedule shall <br /> become the Project Schedule. The Project Schedule, as approved by the City, <br /> will be an integral part of the contract and will establish interim completion dates <br /> for the various activities under the contract. <br /> B. Schedule shall be submitted electronically. Acceptable format .xls, .mpp and pdf. <br /> 01 3216 - 1 CONSTRUCTION PROGRESS SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.