My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 2113 - 10 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor <br /> Form WH347): Contractors, Subcontractors, and agents to Subcontractors <br /> using Payroll Form WH347 may use State of Compliance found on the back <br /> of the form. <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH348). <br /> Contractors, Subcontractors, or agents to Subcontractors not using Payroll <br /> Form WH347 shall attach the Statement of Compliance Form WH348 to <br /> each payroll. <br /> 8. Approval of Subcontractors: Contractors shall request approval of <br /> Subcontractors on a form provided by the City prior to their working on either <br /> Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Section <br /> 00 7200, Part 5 "Progress and Completion", of the Contract Documents by <br /> the Contractor within ten calendar days, or such time as determined by the <br /> City, after the date of receipt of Notice to Proceed. <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the <br /> City's Design and Construction Standards. If, and to the extent, such plans <br /> are not sufficient, complete or adequate to support the Bidder's planned <br /> means and methods of performing the Work, the Bidder must develop an <br /> adequate, complete and sufficient traffic control plan at its cost, that shall <br /> be submitted for the City's approval prior to construction. Deviation from <br /> the Standard Plans must be submitted by the Contractor and approved by <br /> the City prior to construction. <br /> 11 . Disposal Sites: Provide the City with the location of all disposal sites to be <br /> used, and also provide copies of the permits and approvals for such <br /> disposal sites. The Contractor shall provide the City with copies of all <br /> permits for disposal and storage of surplus materials within ten calendar <br /> days after award of the Contract. <br /> 1.23 POSTPONEMENT OF OPENING <br /> A. The City reserves the right to postpone the date and time for receiving or opening <br /> of Bids, or both, at any time prior to the date and time established in the Notice <br /> to Bidders. Postponement notices shall be provided to Bidders in the form of <br /> addenda. <br /> 1.24 BUSINESS LICENSE <br /> A. A City of Everett business license is required for the Contractor and <br /> Subcontractors performing Work on this Project. <br /> END OF SECTION 00 2113 <br /> 00 2113 - 10 INSTRUCTIONS TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.