Laserfiche WebLink
2001 --hin ton State Nonresidential Ener Code Com^�iance Form <br /> . <br /> 2001 Wa�nqlon Sla�a NonresMeiXiel ErrerpY CoDe Canpbe�'e Fortns � June 2(701.KIM <br /> �rojectAddress 10520 39[h Avanua SE Date 7�pi/2008 <br /> The tollowing infortnation is necessary to check a mechanical pertnit application tor compliance with the mechanical requirements in the <br /> Washington State NonresiAential Energy Code. <br /> App�icability Code Location Building Department <br /> (yes,no,n.a.) Sedion Component Information Required on Plans Notes <br /> HVAC RE�UIREMENTS(Sections 1401-7424) <br /> 1411 EVuipment performance <br /> yae 1411.4 Pkg.elec. htg.8 clg. List heat pumps on schedule M-1 <br /> yea 1471.1 Minimum efficiency Equipment schedule with type,capacity,efficiency M-1 <br /> 1412 HVAC control; <br /> yae 1412.1 Temperature zones Indicate locations on plans M-i <br /> yes 1412.2 Deatlband control Indiwte 5 degree deadband minimum M-1 <br /> .a. 1472.3 Humidity control Indicale humidistat <br /> yee 1412.4 Automalic setback Indicate lhe�mostat with night setback and 7 diH.day types M-1 <br /> yee 1412.4.1 Dampers Indicale demper localion end aulometic controls H-i <br /> .a. 1412.42 Optimum Start Indicate optimum start wntrols <br /> .a. 1412.5 Heat pump coNrol Indicate microprocessor on thermostat schedule <br /> .a. 1412.6 Combustion hlg. Indica�e modulating or staged control <br /> yse 1412.7 Balancing Indiwte balancing features on plans M-i <br /> .a. 1422 Thermostat intedock Indicale thermostat interlock on plans <br /> yae 1423 Economizers Equipmentschedule M-1 <br /> 1413 Air economizers <br /> yee 1413.1 Operetion Indicate 100%capability on schedule M-1 <br /> yee 1473.2 Control Indicate conlrols able to evaluate outside air <br /> .a. 1413.3 Inlegrated operation Indicate capability for partial cooling <br /> 1414 Ducting systems <br /> yee 1414.1 Ouct sealing Indicate sealing necessary H-1 <br /> yes 14142 Duct insulation Indicate R-value of insulation on duct M-1 <br /> .a. 1415.1 Piping insulation Indiwte R-value of insulalion on piping <br /> 1416 Completion Requirements <br /> yee 1416.182 Orawings&Manuals Indicate requirement for record drawings antl operation docs. M-1 <br /> yes 1476.32 Air Balancing Indicale air system balance requirement, M-1 <br /> .a. 1416.3.3 Hydronic Balancing Indicate hydronic system baiance requirements <br /> yes 1416.4 Commissioning Indicate requiremenis for commissioning and prelim. Report M-1 <br /> yee 1424 Separate air sys. Indicale separate systems on plans M-1 <br /> yes Mech.Sum.Fortn Completed and attached. Equipment schedute with types, M-1 <br /> inpuVoulput,eKciency,cfm,hp,economizer <br />� SERVICE WATER HEATING AND HEATED POOLS (Sections 1440-1454) <br /> 1440 Service water htg. <br /> .a. 1441 Elec.waler heater Indicate R-10 insulation under tank <br /> .a. 1442 ShuFottcontrols IndicateautomaticshutaH <br /> 1443 Pipe Insulation Indiwle R•value of insulation on piping <br /> .a. 1453 Pool healer controls Indicate swilch and 65 degree control � <br /> .a. 1454 Pool covers Indiwte vapor retardant cover <br /> .a. 7454 Pools 90+degrees Indicate R-12 pool cover <br /> no is c�rc e or any question, provi e exp ana ion: <br /> �( � <br />