My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 2/8/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Jacobs Engineering Group Inc. 2/8/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 10:25:51 AM
Creation date
2/22/2021 10:56:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
2/8/2021
Council Approval Date
2/3/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
CSO Storage at 36th St, Prelim Engineering
Public Works WO Number
UP3700
Tracking Number
0002775
Total Compensation
$323,082.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Jacobs Engineering Inc. 11/3/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Phase 2 Detailed Design <br /> • Phase 3 Construction Assistance <br /> b. Scope tasks for Phases 2 and 3 will be amended based on the outcome of Phase <br /> 1. <br /> c. Budget for the project scope is based on a Phase 1 project schedule of 6 months, <br /> commencing with notice-to-proceed.The budgets and durations of Phases 2 & 3 <br /> are to be determined based on the outcome of Phase 1. <br /> d. Schedule: <br /> • NTP on Feb. 15, 2021 <br /> • Data Review: Feb. 15 —March 15, 2021 <br /> • Site Reconnaissance, preliminary basemap, and geotechnical review: <br /> March 15 —April 15, 2021 <br /> • Review and Verification of Previously Modeled CSO Storage Volume and <br /> system operations: Feb. 15 -April 15, 2021 <br /> • Development of Design and Evaluation Criteria: March 15 —April 30, 2021 <br /> • Development and Evaluation of CSO Control Options: April 30—June 30, <br /> 2021 <br /> • BODR and Final Design Scope Development: July 1—August 15, 2021 <br /> • Phase 1 completion by August 15, 2021 <br /> e. Deliverables will be in electronic format only. <br /> f. Meetings will be held virtually. <br /> g. The Consultant may shift budget between work tasks. <br /> h. The City will provide certain documents including, but not limited to the list <br /> below. <br /> i. The City's drafting Standards will be used. <br /> j. Design and Standard Specifications and Details shall utilize: <br /> • City of Everett's Design and Construction Standards. <br /> • Washington State Department of Transportation/American Public Works <br /> Association (WSDOT/APWA), Standard Specifications for Road, Bridge <br /> and Municipal Construction, 2010 edition. <br /> • The City's master specifications and applicable additional provisions to <br /> the Standard Specifications. <br /> • Washington Department of Ecology latest edition of Criteria for Sewage <br /> Works Design (the Orange Book). <br /> k. The Consultant will rely on General and Special Provisions, Standard <br /> Specifications, and Standard Details provided by the City. The Consultant may <br /> recommend changes to the Standard Specifications where project conditions <br /> warrant. The Consultant will prepare special technical specifications where <br /> required by the project. <br /> 21Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.