My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 2/8/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Jacobs Engineering Group Inc. 2/8/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 10:25:51 AM
Creation date
2/22/2021 10:56:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
2/8/2021
Council Approval Date
2/3/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
CSO Storage at 36th St, Prelim Engineering
Public Works WO Number
UP3700
Tracking Number
0002775
Total Compensation
$323,082.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Jacobs Engineering Inc. 11/3/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. CITY FURNISHED DOCUMENTS <br /> The City will provide the documentation described herein, within 1 week of NTP. <br /> Additional documentation and services to be provided are listed in individual task <br /> assumptions. Documentation provided by the City will include: <br /> a. Recent studies and other information that is relevant to the project. <br /> b. BHC model files <br /> c. BHC modeling report <br /> d. BHC Design Report (for Ecology) <br /> e. Sewer flow monitor data (.csv files) <br /> f. Site information <br /> g. Sewer 0 project information (phase 1 construction documents; phase 2 <br /> preliminary model information) <br /> h. Future transit development plans, constraints, and criteria <br /> i. GIS and as-built data for the project area. <br /> j. Online links to survey monument data. <br /> k. Requirements for survey book. <br /> I. Online link to City Design Standards. <br /> m. Standard and Master specifications. <br /> n. City Special Provisions. <br /> o. Sample plans and specifications as a guide to content and format. <br /> p. Recent unit price-based bid tabs for similar sewer and CSO storage projects, if <br /> available. <br /> 4. SCOPE OF WORK <br /> The work includes three phases: <br /> Phase 1—Preliminary Engineering (Confirmation of Concept and Project <br /> Definition) <br /> Phase 2—Detailed Design <br /> Phase 3 —Construction Assistance <br /> Task 100—Project Management <br /> The purpose of this task is to provide oversight and management of the work, including <br /> contract administration, oversight of subconsultants, quality review and assurance, and <br /> periodic communication with the City. <br /> Activities: <br /> Project Plan.The Consultant will prepare a Project Plan that will describe project <br /> background and purpose, include the project scope, schedule, budget, and deliverable <br /> milestones, list relevant design standards, describe the project-specific QA/QC plan, and list <br /> 3IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.