My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 2/8/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Jacobs Engineering Group Inc. 2/8/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 10:25:51 AM
Creation date
2/22/2021 10:56:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
2/8/2021
Council Approval Date
2/3/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
CSO Storage at 36th St, Prelim Engineering
Public Works WO Number
UP3700
Tracking Number
0002775
Total Compensation
$323,082.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Jacobs Engineering Inc. 11/3/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Conduct field reconnaissance in the vicinity of the project area to determine <br /> geologic, groundwater/surface water, topographic, and environmental <br /> conditions. <br /> d. Prepare an existing conditions technical memorandum and figures summarizing <br /> the results of the geotechnical survey and field reconnaissance. <br /> Deliverables: <br /> • Draft and final Existing Geotechnical Conditions technical memorandum. <br /> 260- Development of Design and Evaluation Criteria for CSO Storage Options <br /> The Consultant shall perform the following: <br /> a. Identify design criteria, assumptions, and constraints for CSO storage options <br /> b. Identify evaluation criteria and weighting of criteria for CSO storage options <br /> i. Life Cycle Cost (to be assigned highest weight) <br /> ii. Constructability <br /> iii. O&M <br /> iv. Environmental <br /> v. Permitting <br /> vi. Property Needs <br /> vii. Community Impacts <br /> c. Technical Memorandum documenting this Task (approximately 5 pages in <br /> length) <br /> Deliverables: <br /> • Design and Evaluation Criteria Tech Memo, draft and final <br /> 270- Evaluation of CSO Storage Options and Operational Strategies <br /> The Consultant shall perform the following: <br /> a. Develop up to three (3) CSO storage construction options, including pumps <br /> where required: <br /> i. Cast in place concrete structure <br /> ii. Pre-cast reinforced concrete structure <br /> iii. Pipe storage system <br /> b. For each of the 3 options, provide conceptual drawings in plan and elevation <br /> views (bluebeam, sketchup, or CAD) on preliminary basemap. <br /> c. For each of the 3 options, provide Class 5 cost estimate (+100%/-50%) <br /> 91Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.