My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 2/8/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Jacobs Engineering Group Inc. 2/8/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 10:25:51 AM
Creation date
2/22/2021 10:56:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
2/8/2021
Council Approval Date
2/3/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
CSO Storage at 36th St, Prelim Engineering
Public Works WO Number
UP3700
Tracking Number
0002775
Total Compensation
$323,082.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Jacobs Engineering Inc. 11/3/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Draft construction phasing plan, including <br /> design and construction phases, and <br /> coordination elements with City's Sewer 0 <br /> project. <br /> • Design scope and schedule (final BODR only). <br /> Basis of Design Workshop. The Consultant will convene a 2-hour Basis of Design Workshop <br /> to present the draft report. <br /> Final Basis of Design Report. The City will review and comment on the draft report.The <br /> Consultant will respond to comments, meeting as required to resolve comments. A Final <br /> Basis of Design Report will be prepared. <br /> Design Scope Development. Following the workshop, the Consultant will develop a Scope <br /> of Work for detailed design. After discussion, the Scope will become the basis for a <br /> contract amendment and the detailed design to follow in Task 400. Design will include <br /> submittals for 30%, 60%, 90%, and final Construction Documents to complete Phase 2. <br /> Deliverables: <br /> • Draft Basis of Design Report <br /> • Agenda, workshop and meeting notes <br /> • Response to comments <br /> • Final Basis of Design Report <br /> Phase 2 - Design <br /> The Consultant will complete detailed design and prepare final plans, specifications, and <br /> construction cost estimates, subject to an amendment to the Scope of Work and Fee <br /> Estimate. Interim documents will be submitted for City review at 30%, 60%, 90%, and 100%. <br /> This Phase will include field surveying and mapping, geotechnical investigations, utility <br /> agency coordination, community relations support, permit and environmental assistance, <br /> and bid assistance. <br /> Phase 3 - Construction Support Services <br /> The Consultant will provide engineering support during construction, subject to an <br /> amendment for said services. Services will include meetings, occasional site visitations, <br /> limited submittal reviews, RFI and issue review and response, preparation of record <br /> 11IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.