Laserfiche WebLink
Do not scale <br /> IF IN DOUBT ASK All <br /> odimensionsininches %oo _ <br /> manually alter gs <br /> Fit cover plate with gasket Fit 3 station identifier lamps (Both front and rear, 6 total) <br /> to redundant drain hole .------�a o 4 <br /> communitytransl� <br /> . 4,4,f <br /> . 1'1* 7 <br /> „i4 <br /> ,i, <br /> \ B 03.01.10 Record Drawing Revision by Otak <br /> A Da.0.06 First Issue <br /> /j Datee Revision <br /> /..... <br /> 11 V V <br /> Install wiring for lamps, ORCA scanners and // \ <br /> RTPI display, run cables through access <br /> hole in departure column and then along � � i <br /> underside of beam -\@x i Fit leaf trap above <br /> 4111‘.40 /"� rainwater downpipe <br /> A V 7. <br /> ....I <br /> --- - ,,, _„,.. 1 V <br /> \ V I ti . Q . <br /> Power and comms cables for RTPI <br /> \ \ X <br /> display routed to this access hole. , 1%, Matedal <br /> X <br /> Drill and Tap holes Finish <br /> for SAFTP on—site X <br /> Install 4x flourescent battens and 5x 'No Service' \ using Drilling Jig. works Order No. <br /> lamps to fitting brackets inside beam section. \ x <br /> Then fit 5x lamp diffuser infill panels shown \ Project <br /> and secure with double—sided tape Swift BM-Shelter <br /> refer to drawing TEL A264 00 506 for further details Client <br /> Community Transit <br /> Title <br /> Shelter Assembly Sequence <br /> At rainwater outlet make <br /> connection to drainage system Scale Date <br /> Notes This connection maybe at departure column. -'p �- X 03.07.08 <br /> This sequence of drawings shows one possible sequence for assembly of the CT bus shelter Cover unused rainwater outlet with c� � Drawn KNB Checked <br /> this is not definative and should not be considered a method statement. cover plate prior to closure pour. (,_ ' jr Drawing no. Rev <br /> * ---" TEL A264 00 520 B <br /> Sheet 4 <br /> x ANSI B J <br />