Laserfiche WebLink
Do not scale _ <br /> IF IN DOUBT ASK Do no emcn any inchest er CAD d\e�ga <br /> communitytransit/ <br /> r <br /> .0. -,°°I.-.-°°-°°°1 - i‘irk <br /> B 03.01.10 Record Drawing Revision by Otak <br /> :7-- --1:1 <br /> A 03 Date6.08 FirsRevision Issue <br /> ______.....000000.0011°":00, <br /> OL/i <br /> 1011h- 404 <br /> 7 <br /> . . ' <000000011, <br /> Install information display area, load center \/ 1111011111"400000000°.fr_____„000000.....A4 <br /> and enclosure, and ticket machines, refer to <br /> drawings: TEL A264 00 503 sheets 1 to 7 for details <br /> 000 <br /> ~ d°1°11/1/ <br /> Electrical connections are required within the load center �����a.� <br /> enclosure and to the ticket machines and to 1` <br /> the IT comms panel behind the information panel <br /> Power and communication cables enter at the base <br /> of the load center. a <br /> Note: The main power cable is routed from the PUD meter � <br /> located in the iconic marker. There is also a returning <br /> cleosupply thempoftheicoc r1IIIIi7111111K1* Dry <br /> Install glazing which includes: / Material <br /> Glazing Panels [118lbs each] X <br /> Gaskets between arm glazingpanel clampstripFinish <br /> X <br /> Clamp Strip to upper face Works Order No. <br /> Refer to drawingTEL A264 00 502 for further details X <br /> Fit lamps and scanners Project <br /> Swift BRT Shelter <br /> Client <br /> Community Transit <br /> Title <br /> • Shelter Assembly Sequence <br /> Scale Date <br /> Notes X 03.070E <br /> This sequence of drawings shows one possible sequence for assembly of the CT bus shelter Drawn KNB Checked <br /> this is not definative and should not be considered a method statement. �i `{x / " e" / Drawing no. Rev <br /> k TEL A264 00 520 <br /> Sheet 5 B <br /> _ <br /> x ANSI B J <br />