Laserfiche WebLink
Y � <br /> 6. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 7. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 8. City streets are to be kept clear of dirt and debris at all times during construction. Dust suppression <br /> and street cleaning must occur as directed by the Public Works Inspector. <br /> 9. A one-year guarantee is required on the public improvement for an amount not less than 10% of the <br /> cost of construction and shall run for one year from the date of final approval. <br /> 10. A water service and sewer stub must be installed to Lot#2 prior to final plat approval. <br /> 11. Stonnwater shall be managed in accordance with the stormwater standards in effect at the time <br /> a complete building permit application, or other type of construction permit application, is <br /> received by the City. The submittal of a complete short subdivision application prior to <br /> 12/31/2016 does not vest a project to pre-2017 stormwater management standards. <br /> Preliminary Approval <br /> Project No.SS16-005 <br /> 11 of II <br />