Laserfiche WebLink
n <br />u <br />1+ <br />Option 3 <br />C <br />I* <br />I• <br />10 <br />Option 4 <br />I* <br />10 <br />:7 <br />Order <br />Native Soil — stockpile site duff and topsoil and reapply after grading and con- <br />struction. <br />• Enter lettered areas from site plan where this option will be used: <br />• Enter combined square footage of lettered areas in thousands <br />(example: for 4,525 sq ft, enter 4.525; for 500 sq ft, enter 0.5) <br />Multiply combined square footage by 25 and enter product in box B: <br />B=Cubic Yards <br />AMOUNT OF TOPSOIL TO BE STOCKPILED AND REAPPLIED IN THESE <br />AREAS <br />Import topsoil. <br />• Enter lettered areas from site plan where this option will be used: <br />T <br />• Enter combined square footage of lettered areas in thousands 8 <br />(example: for 4,525 sq ft, enter 4.525; for 500 sq ft, enter 0.5) <br />• Multiply combined square footage by 25 and enter product in box C: <br />C=Cubic Yards <br />AMOUNT OF IMPORTED TOPSOITHESE NEEDED FOR THESE AREAS <br />Order These Amounts: <br />Enter amount in Box A: <br />Enter amount in Box C : ;), I S <br />Cubic Yards of Compost <br />Cubic Yards of Topsoil <br />Note: MR 5 is triggered on sites with more than 2, 000 sq. ft. of new, replaced, or new plus replaced impervious <br />sui face, or 7, 000 sq. ft. or greater of land disturbing activity. <br />10 <br />