Laserfiche WebLink
Silver Lake Plaza <br />Element # 8: Stabilize Channels and Outlets <br />Channels and drainage outlets are not needed around the proposed development area <br />on site. No stabilization is necessary. Existing channels or drainage outlets located <br />within 500-feet of the property of the property should be routinely inspected for <br />debris that may dam and/or aid erosion. <br />Selected BMP(s) - Not Applicable <br />Element # 9: Control Pollutants <br />All pollutants from construction vehicles will be contained and disposed of in the <br />approved manner consistent with state environmental policies. Any vehicle <br />maintenance will be performed by authorized mechanics using drip pans and waste <br />containment vessels. All pollutants will be disposed offsite at approved facilities. <br />Selected BMP(s) - C151: Concrete Handling <br />C152: Sawcutting and Surfacing Pollution Prevention <br />C153: Material Delivery, Storage, and Containment <br />Element # 10: Control De -Watering <br />De -watering of the site is not expected. If dewatering of the site is needed, all <br />groundwater removed pumped and discharged through a filtering sock and drain into <br />interceptor trenches on site and/or hauled to a City approved site. <br />Selected BMP(s) - Not Applicable <br />Element # 11: Maintain BMP's <br />All Temporary Erosion and Sedimentation Control (TESC) devices and equipment <br />will be inspected and maintained on a weekly basis if not sooner, based on storm <br />events contributing to runoff. When construction is complete and the site is <br />stabilized, any existing sediment will be removed and stabilized onsite. <br />Selected BMP(s) — C150: Materials On Hand <br />Element # 12: Manage the Project <br />A general construction manager will manage the project for or by the owners. The <br />construction manager shall maintain all of the above items in order to minimize <br />sediment transport and turbid water leaving the site. His job will entail continual <br />observation of the grading operations to ensure minimal effects to adjacent properties <br />and offsite waterways. <br />Selected BMP(s) — C150: Materials On Hand <br />C162: Scheduling <br />Element # 13: Protect On -Site Stormwater Management BMPs <br />On -site stormwater BMPs primarily consist of soil amendments. Future soil <br />amendment areas will be protected against compaction where feasible. <br />Selected BMP(s) - C103: High Visibility or Metal Fence <br />C233: Silt Fencing <br />JOB NO: 15-1415-A <br />