Laserfiche WebLink
0 <br />PUBLIC WORKS <br />r77 <br />o Detention Tank Detail: <br />■ Use latest available version of City standard drawings. The current <br />version of Standard Drawing 418, dated 12/30/2016, is not the <br />latest. This comment applies globally to all standard drawings. <br />o Notes: <br />Provide notes consistent with DCSS 4-2.7 Required Notes for Storm <br />Drainage Plans. <br />3. The comments below were generated from this project's Traffic Reviewer. If you have any <br />questions regarding these comments, please contact Michael Brick with the City of Everett <br />Public Works Department (425-257-7790 or MBrickkeverettwa.gov). <br />a. Please address the redlines on Sheet 4 of 7 regarding the driveway, sidewalks, and ADA <br />ramps. <br />4. Please note that a separate,review of the landscaping plans will be conducted by this project's <br />Planning Reviewer with a comment letter issued separately, if needed. If you have any <br />questions regarding the status of their review or the comments themselves, please contact John <br />Jimerson with the City of Everett Planning Department (425-257-8737 or <br />JJimersongeverettwa.gov). Revisions to the landscaping plans should be coordinated with civil <br />revisions to ensure no conflicts, however they can be submitted separately. <br />Page 6 of� <br />