Laserfiche WebLink
Geotechnical Engineering Report <br />Mixed -Use Everett <br />10521-191h Ave. SE <br />Everett, Washington <br />March 23, 2016 <br />RN File No. 3109-001 A <br />Page 8 <br />heavy plastic sheeting, should be placed over the capillary break. An additional 2-inch-thick <br />damp sand blanket can be used to cover the vapor barrier to protect the membrane and to aid in <br />curing the concrete. This will also help prevent cement paste bleeding down into the capillary <br />break through joints or tears in the vapor barrier. The capillary break material should be <br />connected to the footing drains to provide positive drainage. <br />Drainage <br />We recommend that runoff from impervious surfaces, such as roofs, access roadways, and <br />parking, be collected and routed to an appropriate storm water discharge system. The finished <br />ground surface should be sloped at a gradient of 5 percent minimum for a distance of at least <br />10 feet away from the buildings, or to an approved method of diverting water from the <br />foundation, per IBC Section 1804.3. Surface water should be collected by permanent catch <br />basins and drain lines, and be discharged into a storm drain system. <br />We recommend that footing drains be used around all of the structures where moisture control <br />is important. The underlying till may pond water that could accumulate in crawlspaces. It is <br />good practice to use footing drains installed at least 1 foot below the planned finished floor slab <br />or crawlspace elevation to provide drainage for the crawlspace. At a minimum, crawlspaces <br />should be sloped to drain to an outlet tied to the drainage system. If drains are omitted around <br />slab -on -grade floors where moisture control is important, the slab should be a minimum of 1 <br />foot above surrounding grades. <br />Where used, footing drains should consist of 4-inch-diameter, perforated PVC pipe that is <br />surrounded by free -draining material, such as pea gravel. Footing drains should discharge into <br />tightlines leading to an appropriate collection and discharge point. Crawlspaces should be <br />sloped to drain, and a positive connection should be made into the foundation drainage system. <br />For slabs -on -grade, a drainage path should be provided from the capillary break material to the <br />footing drain system. Roof drains should not be connected to wall or footing drains. <br />Infiltration <br />The City of Everett Stormwater Management Manual 2010 (CESMM) chapter 9 section 3.2 <br />requires 3 feet of separation from the bottom of the infiltration system to hard pan or low <br />permeable soils. Our subsurface explorations encountered very dense hard pan/low permeable <br />soils approximately 3 to 3.5 feet below the ground surface. In our opinion, based on the high <br />silt content of the weathered soils and the shallow depth to the very dense glacial till <br />stormwater infiltration is not feasible for the site. <br />Utilities <br />Our explorations indicate that deep dewatering will not be needed to install standard depth <br />utilities. Anticipated groundwater is expected to be handled with pumps in the trenches. We <br />also expect that some groundwater seepage may develop during and following the wetter <br />times of the year. We expect this seepage to mostly occur in pockets. We do not expect <br />significant volumes of water in these excavations. <br />Robinson Noble, Inc <br />