My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/03/03 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/03/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 3:05:21 PM
Creation date
3/4/2021 8:26:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/3/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Plant Facility Plan Amendment 2 I Scope of Work <br />• Provide recommendations for technical information, appendices, etc. updates to meet <br />current DOH guidelines. <br />• Identify SOPs and/or 0&M manuals that are not included in the current WFP Operations <br />Manual that would be beneficial to include. <br />• Facilitate development/collation of missing SOPs and/or 0&M manuals for inclusion in the <br />updated WFP 0&M Manual. <br />Everett Responsibilities <br />• Provide electronic copies of existing and draft revised WFP 0&M Manual. <br />• Everett staff will develop/collate, with BC staff coordination, missing SOPs and/or 0&M <br />manuals identified for inclusion with the updated WFP Operations Manual. <br />Task Assumptions <br />• City to -provide existing WFP 0&M Manual in PDF format, and draft updated 0&M Manual in <br />Microsoft Word format. <br />• Task hours assume that WFP 0&M manual does not exceed 300 pages. <br />• This task will not include production of new sections of operational guidance but will be <br />limited to review and comment on existing 0&M guidance developed by the City. <br />• Assume BC support effort will be limited to 140 hours, to be utilized as -directed by the City. <br />Meetings <br />• Assume 3 coordination and review conference calls, lasting 1 hour each and attended by 2 <br />BC staff. <br />Work Products <br />• Brief technical memorandum summarizing BC's assessment and recommendations for the <br />updated operations and maintenance manual. <br />• Working copy of WFP 0&M Manual file with comments and edits in track changes. <br />o Final version of WFP 0&M Manual to be submitted by June 30, 2021. <br />Task 115 Filter Re -Rating Assessment (future work) <br />Activities/Approach: The City is in the process of studying the possibility of seeking DOH approval for <br />rerating the WFP filters from the current approved rate of 8 gpm/sf to a revised filter loading rate of <br />10 gpm/sf. BC has conducted recent efforts on the Facility Plan project related to potential hydraulic <br />and/or process based bottlenecks resulting from higher flow rates through the plant. The City would <br />like BC to conduct a holistic engineering analysis to determine the effect rerating may have on plant <br />productivity. A rough outline of scope and timing of the requested effort follows. <br />• Review pilot study summary documents, as they become available, to extract filter <br />productivity data needed for plant production assessment. <br />• Review WAC/DOH requirements for hydraulic/plant production information required to be <br />submitted for filter plant rerating. <br />• Analyze WFP hydraulics and unit processes to determine appropriateness of filter rerating <br />and/or any plant limitations that need to be addressed prior to implementing rerating <br />strategy. <br />o Preliminary analysis will identify a universe of potential capital improvements (e.g. <br />new flocculated and filtered water flanged connections, modifications to existing filter <br />Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.