Laserfiche WebLink
City of Everett Water Treatment Plant Facility Plan Amendment 2 I Scope of Work <br />effluent piping, etc.) and modifications to filter operations that will meet the City's <br />plant productivity target. Qualitative advantages/disadvantages will be summarized <br />for these options and will be presented to the City during a virtual workshop. <br />o Pending feedback from the City on preferred options, BC will perform an alternatives <br />analysis on two selected alternatives for improvements. A third alternative, <br />consisting of plant production if no improvements are made beyond filter re -rating <br />(e.g. increasing filtration rates from 8 to 10 gpm/sf) will be presented as a baseline. <br />Budget -level capital cost estimates will be developed for each alternative, along with <br />description of necessary modifications to filter operations. Each alternative will <br />include recommendations for <br />• Provide recommendations for timeline and scope of recommended necessary plant <br />improvements, process changes, etc. that should be implemented as a part of the rerating <br />strategy. <br />Everett Responsibilities <br />• Provide copy of Pilot Work Plan and/or Interim or Final Pilot Study Reports as they become <br />available. <br />• Identify plant production targets/operating scenarios to be achieved via filter re -rating. <br />• Provide review comments and other input to BC on rerating engineering submittal. <br />Task Assumptions <br />• BC's efforts will focus on assessment of the effects that re -rating will have on WFP <br />hydraulics, processes (e.g. backwash, chem feed, rec. water pond pumps and pond level, <br />etc.), and net filter production. BC will not evaluate potential impacts to finished water <br />quality resulting from re -rating. <br />• Communications with WSDOH are not requested at this time. <br />Meetings <br />• Assume 2 coordination and review virtual workshops, lasting 2 hours each and attended by 3 <br />BC staff. <br />Work Products <br />• Technical memorandum summarizing analysis findings, with the necessary level of detail per <br />DOH rerating guidelines for inclusion in a report the City will prepare and submit to DOH. <br />Estimated page count is 10 to 20 pages, not including front end (e.g., table of contents, list <br />of figures, etc.) and appendices. <br />Page 8 of 8 <br />