LEGEND DEMOLITION LEGEND ABBREVIATIONS GENERAL NOTES SEDIM NTO ONTROONOTES CONT) � 1+-„�1 � � I $�J���� <br /> DESCRIPTION SYMBOL DESCRIPTION SYMBOL & AND ECR . END CURB RETURN CEMENT CONCRETE 1. ALL WORK SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND 17. ALL CONSTRUCTION STORMWATER DISCHARGE FROM THE SITE SHALL MEET THE <br /> � AT EG EXISTWG GRADE PED PEDESTRIAN CONSTRUCTION STANDARDS AND SPECIFICATIONS FOR DEVELOPMENT. A COPY REQUIREMENTS OF THE STATE OF WASHINGTON WATER QUALITY STANDARDS <br /> LIMITS OF WORK --------- I7EM TO BE REMOVED q D DEFLECTION ANGLE EJ EXPANSION JOWT PEAF PERFORATED OF THIS DOCUMENT SHALL BE ON SfTE DURING CONSTRUCTION. FOR SURFACE WATERS (CHAPTER 173-201A WASHWGTON ADMINISTRATIVE CODE) <br /> °, DEG DEGREE EL ELEVATION PERP PERPENDICULAR FOR TURBIDITY, pH AND PETROLEUM PRODUCTS. CONSTRUCTION STORMWATER <br /> PROPERTY LINE ITEM TO REMAIN ������������������������������������� 0, DIA DIAMETER ELEC ELECTRICAL Pf POINT OF INTERSECTION 2. EXISTING CONDITIONS SHOWN ARE PER THE PROJECT SITE SURVEY PROVIDED DISCHARGE TURBIDITY FROM THE SITE SHALL NOT EXCEED 5 NEPHLOMETRIC <br /> x BY PERTEET. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR � <br /> NUMBER EMBED EMBED (-DED, -MENT) PN POST INDICATOR VALVE TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES. TURBIDITY UNITS (NTU) OVER BACKGROUND TURBIDITY WHEN THE BACKGROUND Heerylnternationallnc. <br /> EASEMENT LINE - - CAP UTILITY, , % PERCENT ENGR ENGMEER PL PROPERTY LINE, PLATE TURBIDITY IS 50 NTU OR LESS, OR HAVE MORE THAN A 10 PERCENT INCREASE <br /> SEE SITE DEMOLITION r- f'c CONCRETE COMPRESSIVE EOR ENGINEER OF RECORD PLUMB PLUMBING 100 East Pine Street, Suite 300 <br /> CENTERLINE 3. THE LIMITS OF WORK INDICATED ON THE CIVIL DRAWINGS APPLY TO THE SITE IN TURBIDITY WHEN THE BACKGROUND TURBIDITY IS MORE THAN 50 NTU. THE Orlando, Florida 32801 . <br /> STRENGTH EQ E�UAL POLY POLYETHYLENE AND UTILITY WORK SHOWN ON THESE DRAWINGS ONLY. THERE MAY BE WORK pH OF THE CONSTRUCTION STORMWATER DISCHARGE SHALL BE WITHIN THE 407.992.6300 . <br /> REMOVE EXISTING fy REWFORCING STEEL YIELD � EQUIP E�UIPMENT PRC POINT OF REVERSE OUTSIDE OF THE LIMITS OF WORK INDICATED BY OTHER DISCIPLINES OR RANGE OF 6.5 TO 8.5 WITH A HUMAN-CAUSED VARIATION WITHIN A RANGE OF <br /> STORM DRAM W�ET PROTECTION � ASPHALT PAVEMENT STRENGTH ESMT EASEMENT CURVATURE TRADES. LESS THAN 02 UNITS. CONSTRUCTION STORMWATER DISCHARGES SHALL BE <br /> (BMP C220) EST ESTIMATE (-D) PROP PROPERTY PROHIBITED IF THERE IS A VISIBLE SHEEN FROM PETROLEUM PRODUCTS. � 0002293 <br /> ABAN ABANDON (-ED) EVC END VERTICAL CURVE PROT PROTECTION 4� SEE THE CIVIL DRAWINGS FOR CIVIL LIMITS OF WORK. UNDER NO CONTRACTOR SHALL PROVIDE FILTRATION AS REQUfRED TO MEET DISCHARGE EB 0005176 . <br /> TEMPORARY SLOPE PROTECTION REMOVE EXISTMG AC ASBESTOS CEMENT, EW EACH WAY PSF POUNDS PER SOUARE FOOT CIRCUMSTANCES SHALL WORK BE DONE OUTSIDE THE LIMITS OF WORK, UNLESS WpTER �UALITY STANDARDS. �• <br /> (BMP C123) CONCRETE PAVEMENT � ASPHALT CONCRETE EXCAV EXCAVATION PSI POUNDS PER SWARE INCH INDICATED, WITHOUT WRITTEN APPROVAL FROM THE OWNERS REPRESENTATNE. <br /> AD AREA DRAIN EXIST EXISTING PT POINT OF TANGENCY, POINT ANY WORK DONE IN AREA ADJACENT TO THE LIMITS OF WORK SHALL BE S N O H OMIS H <br /> CARRIED OUT ON THE PROJECT SIDE ONLY. 18. INSTALL HIGH VISIBILITY PLASTIC FENCE AT THE LIMITS OF WORK/GRADING. <br /> SEDIMENT CATCHMENT ADA AMERICANS WITH EXP EXPANSION PVC POLYVINYL CHLORIDE HIGH VISIBILITY PLASTIC FENCE SHALL BE COMPOSED OF A HIGH-DENSITY <br /> AREA � DISABILITIES ACT EXT EXTERIOR PVI POINT OF VERTICAL 5. EXCAVATION SHALL BE IN ACCORDANCE WITH THE GEOTECHNfCAL ENGfNEERING POLYETHYLENE MATERIAL AND SHALL BE AT LEAST FOUR FEET IN HEIGHT. CO U NTY <br /> ADDL ADDITIONAL INTERSECTION DESIGN STUDY. THE CONTRACTOR SHALL COMPLY WITH REPORT POSTS FOR THE FENCING SHALL BE STEEL OR WOOD AND PLACED EVERY 6 � <br /> CENTERLINE OF SWALE - - - ADJ ADJACENT, ADJUST f-ED, FD FOUNDATION DRAIN, PVMT PAVEMENT RECOMMENDATIONS FOF2 TEMPORARY CONSTRUCTIINJ SLOPES AND SHALL NOT FEET IXJ CENTER IMAXIMUM) OR AS NEEDED TO ENSURE RIGIDITY. THE FENCING � <br /> -MENT, -ABLE) FOOTING DRAIN EXCEED THOSE SLOPES WITHIXIT PRIOR WRITTEN APPROVAL OF THE SHALL BF FASTFNFD TO THF POST FVERY SIX WCHFS WITH A POLYETHYLENE <br /> TOP OF SLOPE AGGR AGGREGATE FDC FIRE DEPARTMENT � FLOW RATE GEOTECHNICAL ENG[NEER. TIE. ON LINJG CONTINUWS LENGTHS OF FENCIN�, A TENSION WIRE OR ROPE CO U RTHO U S E <br /> TOE OFo3LOPE � APpD APPROVEDE, ALTERNATIVE FDN FOUNDATION R RADIUS 6. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER THELFENCEUCOLORSSHALLP ETHIGHEVISIBILITYEORANGE.GTHE FE CEETENSILE RE N OVATIO N . <br /> U-800-424-5555) PAfOR TO EXCAVATING. THE CONTRACTOR SHALL BE <br /> APPROX APPROXIMATE (-LY) FF FINISHED FLOOR RCMD RECOMMEND (-ED) RESPONSIBLE FOR OBTAINING THE SERVICES OF A PROFESSIONAL UNDERGROUND STRENGTH SHALL BE 360 LBS./FT. USWG THE ASTM D4595 TESTING METHOD. �� <br /> COMPOST FIUER SOCK ARCH ARCHITECT (-URAU FG FINISHE� GRADE RCP REINFORCED CONCRETE UTILITY LOCATION SERVICE TO LOCATE AND MAINTAIN MARKINGS THAT <br /> (BMP C235) ASPH ASPHALT FH FIRE HYDRANT PIPE INDICATE LOCATIONS OF UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA. 19. MAINTAIN EX[STING PAVEMENTS AND PERIMETER RETAINING WALLS SHOWN TO <br /> LfMITS OF STRUCTURE �1 ASSY ASSEMBLY FIN FINISH (-ED) RED REDUCER, REDUCING BE REMOVED FOR AS LONG AS POSSIBLE AS A SOIL STABILIZATION MEASURE. <br /> ASTM AMERICAN SOqETY FOR FL FLOOR, FLOWLINE, FLANGE REF REFER (-ENCE) 7. SEE THE PROJECT SURVEY FOR THE BASIS OF THE PROJECT COORDMATE <br /> OVERHEAD TESTWG AND MATERIALS FM FORCE MAIN REINF REMFORCE (-D, -MENT), � SYSTEM. VERTICAL DATUM IS NGVD 88. 20. AT A MINIMUM THE ADDITIONAL CITY OF EVERETT SWRCE CONTROL BEST <br /> 1 project number <br /> 8" SD ATB ASPHALT TREATED BASE FT FOOT, FEET REWFORCING MANAGEMENT PRACTICES (BMPS) LISTED BELOW SHALL BE IMPLEMEMED ON � <br /> PERFORATED STORM DRAIN --------- AVE AVENUE FTG FOOTING REQD RE�UIRED 8 PUB IC SIDE ALKST TRAFFIC STREET USE PERMIT IS RE�UIRED TO CLOSE ANY THE PROJECT SITE SEE THE 2010 STORMWATER MANAGEMENT MANUAL, HI-1309100 <br /> 8" SD RET RETA[NING VOLUME 11, CONSTRUCTION STORMWATER POLLUTION PREVENTION, CHAPTER 3 <br /> STORM DRAIN BCR BEGIN CURB RETURN G 6A5, GUTTER REV REVISION FOR ADDITIONAL INFORMATION. consultants/construction managers . <br /> BFP BACK FLOW PREVENTER GA GAGE, GAUGE RIM RIM ELEVATION <br /> AREA DRAIN OO BLDG BUILDING GAL GALLON RJ RESTRAINED JOINT TEMPORARY EROSION AND SEDIMENT CONTROL NOTES A. BMP C120� TEMPORARY AND PERMANENT SEEDIN6 MAGNUSSON <br /> CAPPED END � BLK BLOCK (-IN�) GALV GALVANIZE (-D) RL RAM LEADER B. BMP C140� DUST CONTROL � . <br /> BM BEAM, BENCH MARK GB GRADE BREAK ROW RIGHT-OF-WAY 1. THE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN SHALL BE C. BMP C150� MATERIAL ON HAND KL EM.EN C I C , __ <br /> CATCH BASfN � BMP BEST MANAGEMENT GEN GENERAL RPM RAISED PAVEMENT MARKER IMPLEMENTED PRIOR TO ANY LAND-DISTURBIN� ACTIVITY ON THE D. BMP C151� CONCRETE HANDLING ASSOCIATES ['" <br /> PRACTICE GPM GALLONS PER MINUTE RT RIGHT CONSTRUCTIIXJ SITE. E. BMP C152� SAWCUTTING AND SURFACENG POLLUTION PREVENTION so-�<w�oi + CivilEngineers <br /> BOL BOLLARD �V GATE VALVE RW RECYCLED WATER F. BMP C153� MATERIAL DELIVERY, STORAGE AND CONTAINMENT � <br /> CLEANWT � BOT BOTTOM 2. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF DIRT FROM ALL VEHICLES � <br /> MANHOLE BOW BOTTOM OF WALL H HORIZONTAL S SLOPE, SWTH LEAVIN� THE SITE. ACTIONS MUST BE TAKEN TO MINIMIZE THE TRACKING OF 21. A DISCHARGE AUTHORIZATION PERMIT FROM THE CITY OF EVERETT <br /> O BSMT BASEMENT HDPE HIGH DENSITY SCHED SCHEDULE MUD AND SOIL FROM CONSTRUCTION AREAS ONTO PUBLIC ROADWAYS. THE MAINTENANCE DIVISIIXJ IS REQUIRED FOR DISCHARGE TO THE COMBINED SEWER. <br /> SOLIDWALL FIXINDATION DRAIN 6" FD BTWN BETWEEN POLYETHYLENE SD STORM DRAIN CONTRACTOR IS RESPONSIBLE FOR KEEPING ADJACENT ROADWAYS FREE OF CONTACT BRIAN DOOLAN AT 425-257-8288 Ofi BDOOLAN�EVERETTWA.GOV. . <br /> BVC BEGW VERTICAL CURVE HH HANDHOLE SDMH STIX2M DRAIN MANHOLE DIRT. SOIL TRACKED ONTO THE ROADWAY SHALL BE REMOVED DAILY. - <br /> 6" PERF FD HMA HOT MIX ASPHALT SE SOUTHEAST 22. THE FOLLOWING SMALL PROJECT BEST MANAGEMENT PRACTICES, OUTLINED IN <br /> PERFORATED FOUNDATION DRAIN --------- CANT CANTILEVER HORIZ HORIZONTAL SECT SECTION 3. ANY SOIL STOCKPILES SHALL BE LOCATED AWAY FROM SWALES AND CATCH THE CITY OF EVERETT DESI�N AND CONSTRUCTION STANDARDS AND <br /> CB CATCH BASIN HP HIGH POINT SHT SHEET BASINS. STOCKPILES SHALL BE MULCHED, AND ADEQUATELY CIXJTAINED SPEqFICATIONS FOR CINJSTRUCITON, SHALL BE IMPLEMENTED ON THE PAOJECT <br /> DROP CONNECTION - 4 CC CENTER TO CEMER HT HEIGHT SIM SIMILAR � <br /> THROUGH THE IISE OF SEDIMENT BARRIERS. SITE. <br /> CDF CONTROLLED DENSITY FILL HTB HORIZONTAL THRUST BLOCK S0� SLAB ON GRADE <br /> FOUNDFTION SLEEVE - CFS CUBIC FEET PER SECOND HYD HYDRANT SPC SPACE <br /> 4. MITIGATION MEASURES SUCH AS DUST SUPPRESSION TECHNIUUES SHOULD BE IN A. BMP ES1.0� PLANNED CLEARING AND GRADING <br /> CI CAST IRON SPEC SPECIFICATION PLACE DURING DEMOLITION AND CONSTRUCTION EVENTS TO MINIMIZE THE B. BMP ES2.0� EXCAVATED BASEMENT SOIL <br /> N 1,433,54484 CIP CAST-IN-PLACE ID INSIDE DIAMETER SQ S�UARE TRACKING AND BROADCASTING OF FUGITIVE PARTICULATE EMISSIONS ONTO C. BMP ES3.0� BACKFILLING <br /> COORDINATE POINT E 2, 987454 02 CJ CONSTRUCTION JOINT IE INVERT ELEVATION SS SANITARY SEWER <br /> PUBLIC ROADWAYS AND ACROSS PROPERTY LINES. D. BMP ES4A� REMOVAL OF EXCESS SOIL <br /> CL CENTERLINE IN INCH SSMH SANITARY SEWER MANHOLE E. BMP ES5.0� MANA6EMENT OF SOIL BANKS <br /> BUILDING ��������� �� � CLR CLEAR (-ANCE) INCL INCLUDE (-D), INCLUDING ST STREET 5. AT THE CONTRACTOR'S OPTION ALTERNATE METHODS OF TREATMENT OF F. BMP ES8.0� STREET CLEANING " <br /> � CMP CORRUGATED METAL PIPE INFO INFORMATION STA STATION CONSTRUCTION STORMWATER RUNOFF MAY BE PROPOSED FOR USE FOR G. BMP E59.0� FLOW PATH REDUCTION <br /> CNR CORNER INT INTERIOR, INTERSECTION STD STANDARD TEMPORARY SEDIMENTATION. THE PROPOSED ALTERNATE METHODS MUST MEET <br /> CO CLEAN OUT INV INVERT STL STEEL THE EFFLUENT QUALITY REQU[RED BY THE STATE OF WASHINGTON WATER <br /> COE C1TY OF EVERETT IRR IRRIGATION STRUC STRUCTURAL, STRUCTURE QUALITY STANDARDS FOR SURFACE WATERS. THE CONTAACTOR SHALL SUBMIT <br /> COL COLUMN SW SOUTHWEST THE ALTERNATE METHODS FOR REVIEW AND APPROVAL BY THE OWNER'S <br /> COMB COMBINATION JT JOINT SYM SYMMETRICAL REPRESENTATNE PRIOR TO BEGINNING WORK. SEE NOTE 17. <br /> COMM COMMUNICATION <br /> CON CONCENTRIC LARCH LANDSCAPE ARCHITECT TB THRUST BLOCK 6. ALL DISCHARGES FROM ANY ACTIVE DEWATERING SYSTEM SHALL BE TREATED <br /> CONC CONCRETE (-URAU TC TOP OF CURB pR10R TO LEAVING THE PROJECT SITE BY DIRECTWG WATER TO THE SEDIMENT � <br /> COND CONDUIT, CONDITION LAT LATERAL TD TRENCH DRAW TRAPPING DEVICES AND MEET THE EFFLUENT �UALITY REQUIRED BY THE � .. <br /> CONN CONNECT (-IOM LB POUND TEMP TEMPORARY STATE OF WASHINGTON WATER QUALITY STANDARDS FOR SURFACE WATERS seal/signature <br /> CIXJST CONSTRUCTION LF LWEAR FEET TESC TEMPORARY EROSION AND BEFORE BEING DISCHAR�ED OFFSITE. SEE NOTE 17. <br /> CONT CONTINUATION, CONTINUE, LOC LOCATE (-D), LOCATION SEDIMENT CONTROL P ni. GRF <br /> CONTINUOUS LP LOW POINT TOF TOP OF FOOTING 7. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE ���EOF "�".`�'',�'�'en <br /> CONTR CONTRACTOR LT LEFT TOW TOP OF WALL EROSION CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED AS „ r <br /> COORD COORDINATE, COORDINATION LVL LEVEL TYP TYPICAL RE�UIRED TO ENSURE CONTINUING EROSION AND SEDIMENTATION CONTROL. <br /> CORP CORPORATION � � <br /> CP CONTROL POINT, CENTER MATL MATERIAL UNO UNLESS NOTED OTHERWISE 8. THE IMPLEMENTATION, MAWTENANCE, REPLACEMENT AND ADDITIONS TO TNE �F ����" ._�`� <br /> POINT MAX MAXIMUM UTIL UTILITY EROSION AND SEDIMENTATION CONTROL SYSTEMS SHALL BE THE FssrorvAt E�' yll9 <br /> CTB CEMENT TREATED BASE MECH MECHANICAL RESPONSIBILITY OF THE CONTRACTOR. ANY DOWNSTREAM DAMA�E DUE TO THE 7P � <br /> CTR CENTER MFR MANUFACTURE I-R) V VERTICAL FAILURE BY THE CONTRACTOR TO FULFILL THESE REQUIREMENTS WILL BE THE - <br /> CU CUBIC MH MANHOLE VAC VACUUM CONTRACTOR'S LIABILITY. issuedfor date <br /> CULV CULVERT MIC MONUMENT IN CASE VB VALVE BOX <br /> MIN MINIMUM, MINUTE VC VERTICAL CURVE 9. THE TEMPORARY EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON CONSTRUCTION 05/04/2018 <br /> D, d DEFLECTION ANGLE MISC MISCELLANEOUS VDM VERTICAL DRAINAGE THESE DRAWMGS ARE INTENDED TO BE MINIMUM AEQUIREMENTS. ADDITIONAL DOCUMENTS <br /> �j B DU TBAN ( MJ MECHAMCAL JOINT MATERIAL FACILITIES SHALL BE INSTALLED AS NECESSARY AND MAINTAINED BY THE <br /> item date <br /> DCSS CI Y F V RE ESIGN �1L MATCHLINE VERT VERTICAL . CONTRACTOR TO PREVENT SEDIMENTATfON OUTSIDE THE LIMITS OF WORK. � <br /> AND CONSTRUCTION MON MONUMENT Vff VERIFY W FIELD <br /> STANDARDS AND MSE MECHANICALLY STABILIZED VOL VOLUME 10. THE TEMPORARY EROSION CONTROL MEASURES SHALL BE MAINTAINED IN A QQ ASI N0. 4 07/19/2018 <br /> SPECIFICATIONS FOR EARTH VTB VERTICAL THRUST BLOCK SATISFACTORY CONDITION FOR THE DURATION OF THE CONTAACT OR UNTIL <br /> EV L P E T MUTCD MANUAL ON UNIFORM DIRECTED BY THE OWNER'S REPRESENTATIVE � <br /> DEG, ° � GREE TRAFFIC CIXJTROL DEVICES W WATER, WEST, WIDTH � <br /> DEMO DEMOLISH, DEMOLITION W/ WITH 11. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION SITE AND ADJACENT AREAS <br /> DEPT DEPARTMENT N NORTH (-ING) W/0 WITHWT CLEAN AT ALL TIMES BY SWEEPWG. WASHDOWN WITH WATER WILL NOT BE � <br /> DET DETAIL NA NOT APPLICABLE WHT WHITE ALLOWED WITHOUT PRIOR APPROVAL DRAWING LIST <br /> DI DUCTILE IRON NE NORTHEAST WP WORK POINT �1 SHEET N0. SHEET TITLE <br /> DIA, 0 DIAA�ETER NIC NOT W CONTRACT WPJ WEAKENED PLANE JOINT 12. TIIE CONTRACTOR SIIALL PLACC STORM DRAIN INLCT PROTCCTION AT ALL � <br /> ; DIAG DIAGONAL NOM NOMINAL WS WATER SURFACE CATCH BASINS WITHW THE LIMITS OF WOFtK, INCLUDING THOSE SCHEDULED FOR C-001 NOTES, LEGEND, ABBREVIATIONS, AND DRAWWG LfST � <br /> ' DICA DRILLED-IN CONCRETE NTS NOT TO SCALE WT WEIGHT DEMOLITION PRIOR TO THEIR REMOVAL IF THEY WILL RECEIVE CONSTRUCTION C-002 NOTES � � � � <br /> S ANCHOR NW NOftTHWEST 0�(' Ii ' T 3T E � STORMWATER RUNOFF. STORM DRAIN INLET PROTECTION SHALL AL50 BE <br /> a DIM DIMENSION �EPARTMENT OF ECOLOG PLACED WHERE SPECIFIED IN ACCORDANCE WITH SECTION 015713. THERE MAY CD101 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN <br /> -� DIR DIRECTION OC ON CENTER W T WA NG 0 A E <br /> DOM DOMESTIC OD OUTSIDE DIAMETER DEPARTMENT OF BE STORM DRAM MLET PAOTECTION RE�UIRED WTSfDE OF LIMITS OF WORK CD102 SITE DEMOLITION PLAN _ _ <br /> INDICATED. STIX2M DRA[N INLET PROTECTION SHALL BE WSTALLED IN CS101 SITE PLAN <br /> 9 DS DOWNSPWT OPNG OPENWG TRANSPORTATION ACCORDANCE WITH CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS - �-- <br /> DWG DRAWING OPP OPPOSITE (HAND) WWF WELDED WIRE FABRIC AND SPECIFICATIONS FOR DEVELOPOMENT, STANDARD DRAWIN6 NUMBER 210. CU101 UTILITY PLAN . _ . _ _ <br /> o DWL DOWEL OPT OPTION (-AU CU102 FOUNDATION DRAIN PLAN <br /> � DWY DRIVEWAY ORIG ORIGINAL YD YARD 13. THE CONTRACTOR SHALL PROTECT ALL UTILITY ACCESS POINTS THAT DO NOT C-201 SECTIONS AND DETFILS <br /> � OWS OIVWATER SEPARATOR YEL YELLOW RECEIVE STORM DRAIN INLET PROTECTION SUCH AS MANHOLE COVERS, VAULT � <br /> °' (E) EXISTING COVERS AND GRATES FROM COLLECTING ANY STORMWATER DURING C-202 SECTIONS AND DETAILS <br /> � E EAST (-ING) PC POINT OF CURVATURE CONSTRUCTION. PLACE IMPERVIOUS SHEETING AROUND ACCESS POINTS TO <br /> �'-, EA EACH PCC POINT OF COMPOUND PREVENT STORMWATER COLLECTION. <br /> ECC ECGENTRIC GURVATURE, PORTLAND � <br /> � 14. EXCAVATION FOR REMOVAL OF EXISTING STRUCTURES AND INSTALLATION OF - <br /> d NEW STRUCTURES, UTILITIES AND EMBANKMENTS SHALL BE IN ACCORDANCE � <br /> F WITH THE 6EOTECHNICAL REPORT BY HART �CROWSER. THE CONTRACTOR SNALL � <br /> N COMPLY WITH THE STUDY RECOMMENDATIONS FOR TEMPORARY CONSTRUCTfON <br /> � SLOPES AND SHALL NOT EXCEED THOSE SLOPES WITHOUT PRIOR APPROVAL OF <br /> g THE GEOTECHNICAL ENGINEER. <br /> % 1 <br /> � <br /> z 15. ALL TEMPORARY CONSTRUCTION SLOPES GREATER THAT 3�1 AND GREATER THAN <br /> � 4 FEET IN HEIGHT SHALL HAVE TEMPORARY SLOPE PROTECTION IN ACCORDACE <br /> i W�TH � sheet title <br /> E c oo, c-zo, NOTES, LEGEND , . <br /> w i6. STABILIZE ALL SOILS, INCLUDIN6 STOCKPILES THAT ARE TEMPORARILY AB B REVIATION S � <br /> � EXPOSED. FROM OCTOBER 1 TO APRIL 30 NO SOILS SHALL REMAIN AN D D RAWI N G LIST <br /> UNSTABILIZED FOR MORE THAN TWO DAYS. FROM MAY 1 TO SEPTEMBER 30 NO <br /> SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN SEVEN DAYS. � <br /> a STABILIZATION MAY INCWDE BUT IS NOT LIMITED TO STRAW MULCH, EAOSIINJ <br /> � CONTROL BLANKETS, PLASTIC SHEETING AND TEMPIX2ARY SEEDING. /� sheetnumbe/r� <br /> � `�Y m� � Y <br /> m <br /> ; drawn bv LT checked bv RMG <br /> OAttMdXeerylmam¢ewl,�� aMnepyMumatlmxM.nhinna�ngn4lNren.IntlW"ry¢mylqMc4mayenybuwFemnnamcl�bniMi�Nsryln'.emnv�alue.'enB� ��wMrory Copyngn�ClOi]EyHae � <br /> w.�im�.mw�+e�m.m,s.m�aevtt�P�w=e�e.�en.emrer.,�.eio�.�e.d..�.a.n.b,. x v ��.w�aarvmm.vwo•.•,�•m.�mw�.w�...�m�.s�.m.��n,e.e�ce����, w„Enow*reon.riuszemise�errMasurz�sx�..r <br /> �rvi�w�.u,.,a� <br />