Laserfiche WebLink
SITE DEMOLITION NOTES CITY OF EVERETT EROSION AND SEDIMENT CONTROL NOTES � �� � I ��1L�� <br /> . L THE CONTRACTOR SHALL PROVIDE, ERECT AN� MAMTAIN ALL TEMPORARY BARRIERS �, pppROVAL OF THIS EROSION AND SEDIMENT CONTROL (ESC) PLAN DOES NOT <br /> AND SECURITY DEVICES AS NECESSARY. CONSTITUTE AN APPROVAL OF THE DRAINAGE DESIGN. <br /> 2 THE CONTRACTOR SHALL COORDINATE THE REMOVAL, ABANDONMENT AND/OR CAPPING OF Z, THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, � <br /> EXISTING UTILITIES WITH THE APPLICABLE UTILITY AGENCY, INCLUDING BUT NOT REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF <br /> LIMITED T0� THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED <br /> AND VEGETATION/LANDSCAPING IS ESTABLISHED. Heery Intemational Inc. <br /> A. EXISTING WATER CONNECTIONS - CITY OF EVERETL � 100 East Pine Street, Suite 300 <br /> B. EXISTING NATURAL GAS CONNECTIONS - PUGET SOUND ENERGY. 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY Orlando, Florida 32801 � <br /> C. EXISTING TELECOMMUNICATIONS CONNECTIONS - PURVEYORS MAY WCLUDE BUT FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. �URING THE CONSTRUCTION PERIOD, 407.992.6300 <br /> ARE NOT LIMITED TO FRONTIER, WAVE, INTEGRA, BLACKROCK, COMCAST. NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE <br /> D. EXISTING STORM DRAINAGE AND SANITARY SEWERS - CITY OF EVERETT. FLAGGMG SHALL BE MAMTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION <br /> E EXISTWG POWER CONNECTfONS - SNOHOMISH COUNTY PUBLIC UTILITY OF CONSTRUCTION. AA 0002293 <br /> DISTRICT. <br /> 3. EXCAVATfON FOR REMOVAL OF FOUNDATIONS, SLABS ON GRADE AND UTILITIES SHALL 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION <br /> BE IN ACCORDANCE WITH THE PROJECT�S GEOTECHNICAL ENGWEERING REPORT BY HART WITH ALL CLEARING AND GRADING ACTNITIES, AND IN SUCH A MANNER AS TO ENSURE <br /> CROWSER. THE CONTRACTOR SHALL COMPLY WRH THE REPORT RECOMMENDATIONS FOR ROADWAYSMORTVIOLATE APPL CABLE WATER QOALITY STAN�ARDS. DRAINAGE SYSTEM, S N OH O MIS H <br /> PRMOR APPROVAL OF THE GEOTEC N CAL ENGWEERT EXCEED THOSE SLOPES WITHOUT T�/ <br /> 4. CAP OR PLUG UTILITY SERVICES AT THE LIMITS OF EXCAVATION OR AT THE LIMITS OF 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REOUIREMENTS FOR CO U N 1 1 <br /> ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC <br /> WORK, UNLESS NOTED OTHERWISE. FACIUTIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO <br /> ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE THE SITE. CO U RTH O U S E <br /> 5 CONDUCTORS HAVELBEEN'DECOMMISSIONEDLPRIOR TO REMOVAL OF COMMUN C'ATIO SN AND 6. THE ESC FACILITIES SHALI BE INSPECTED ROUTINELY AND MAINTAWED BY THE RE N OVATION <br /> TELEPHONE DUCTBANK CONDUIT AND VAULTS. APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY <br /> AFTER STORM EVENTS. . <br /> 6. DEMOLITION ASSOCIATED WITH ELECTRICAL LWES AND APPURTENANCES SHALL BE 7. THE ESC FACILITIES ON INACTNE SITES SHALL BE WSPECTED AND MAINTAMED A <br /> COORDINATE� WITH THE ELECTRICAL DRAWINGS. DEMOLITION FOR SPECIF[C ELECTRICAL MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWMG A MAJOR STORM <br /> ITEMS WDfCATED ON THE DEMOLITfON P�ANS SHALL NOT BE CARRIED OUT UNTfL EVENT. <br /> POWER SOURCES TO THE ITEMS INDICATED FOR REMOVAL HAVE BEEN MADE SAFE � <br /> 7. REMOVAL OF ELECTRICAL DUCTBANK, CONDUITS AND VAULTS SHALL FOLLOW PULLMG 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE projectnumber <br /> OF CABLE AND CONDUCTORS AS SHOWN ON THE ELECTRICAL DRAWINGS. WITHW A TRAPPED CATCN BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL <br /> BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT . HI-1309100 <br /> 8. REMOVE E%fSTING CONCRETE PAVEMENT TO FULL DEPTH. BASE COURSE MATERIAL MAY LADEN WATER WTO THE DOWNSTREAM SYSTEM. <br /> REMAIN IN NEW PAVEMENT AREAS. � � consultants/constmction managers <br /> 9. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE <br /> 9. REMOVE EXISTING ASPHALT CONCRETE PAVEMENT TO FULL DEPTH. BASE COURSE KEPT CLE!!N FOR THE DURATION OF THE PROJECL MAG N U S S ON ri{ � <br /> MATERIAL MAY REMAIN IN NEW PAVEMENT AREAS. 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND KLE MENC IC `�:_„..,._, <br /> 10. PROTECT ALL EXISTING STRUCTURES AN� FOUNDATIONS INDICATED TO REMAIN DURING SEDIMENT TRACKED OFF THE SiTE ASSOCIATES � ['7 <br /> CONSTRUCTION. CONTRACTOR SHALL PROVIDE SHORWG AS REQUIRED IN ORDER TO N0T ��. pppROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE <br /> IMPACT EXISTMG STRUCTURES� FOUNDATIONS AND RETAINING WALLS. WATER BODIES IF THE PROPOSE� BEST MANAGEMENT PRACTICES FAIL 50-omural + GvilEn9�neec <br /> 11. PROTECT ALL EXISTING UTILITIES INDICATED TO REMAW FROM DAMAGE AT ALL TIMES �p. BARE AN�/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR <br /> DURING CONSTRUCTION. .CONTRACTOR SHALL PROVIDE TEMPORARY SHORING AS REQUIRED NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 <br /> TO ENSURE ADEQUATE PROTECTION OF UTILITIES TO REMAIN AND THEIR DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br /> APPURTENANCES. CONTRACTOR SHALL FiELD VERIFY EXISTING CONDITIONS PRIOR TO <br /> COMMENCEMENT OF DEMOLITION OPERATIONS AND NOTIFY THE OWNER'S REPRESENTATIVE <br /> OF ANY DISCREPANCIES. � <br /> STORM DRAIN NOTES CITY OF EVERETT STORM DRAIN NOTES <br /> 1. A COPY OF THE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION 1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE � <br /> IS IN PROGRESS. UNTIL IT HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. <br /> 2. ALL REQUIRED STORM WATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION 2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND <br /> PRIOR TO ANY PAVING. CONSTRUCTION STAN�ARDS AND SPECIFICATIONS AND THE WSDOT/APWA STAN�ARD <br /> � SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITIONI. <br /> 3. WSTALL CATCH BASIN INSERTS UNDER ALL CATCH BASIN AND AREA DRAIN GRATES <br /> IMMEDIATELY AFTER MSTAL�ATION. PROTECTION SHALL BE REMOVED AFTER FMAL 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAMED FROM <br /> PAVING AND/OR LAN�SCAPING HAS BEEN ESTABLISHED. AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE THE CONTRACTOR SHALL BE � <br /> RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY <br /> 4. TOP ELEVATION FOR ALL CATCH BASINS WITH SOLI� COVER SHALL MATCH FINISH ADDITIONAL UTILITIES SHOWN. ff CONFLICTS WfTH EXISTING UTILITIES ARISE DURWG <br /> GRADE. CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND <br /> ANY CHANGES RE�UIRED SHALL BE APPROVE� BY THE CITY ENGMEER PRIOR TO <br /> 5. UNLESS NOTED OTHERWISE, THE CONTRACTOR MAY USE ANY COMBINATION OF COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECL � <br /> PREFABRICATED FITTINGS (TEES, BENDS AND WYES) AT LOCATIONS WHERE STORM <br /> CONNECTION POINTS OF INTERSECTION (PI) ARE WDICATED. PREFABRICATED FITTINGS 4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR W EASEMENTS MUST BE <br /> MAY BE ADJUSTED AS RE�UIRED TO MAWTAIN POSITIVE SLOPE AND DRAINAGE. WHERE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. � seallsignature <br /> SPECIPICALLY WDICATED, THE CONTRACTOR SHALL PROVIDE THE FITTWGS AS SHOWN. <br /> 5. ALL CATCH BASIN GRATES MUST BE STENCfLED OR STAMPED 'DUMP NO WASTE, DRAINS M. GR <br /> 6. COORDINATE POMTS AN� ELEVATIONS SHOWN FOR ALL CATCH BASINS, CLEANOUTS, AND TO STREAM, LAKE, RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE ��Poe wnm,FFJy <br /> AREA DRAINS ARE TO THE CENTER OF THE FRAME AND GRATE OR COVER, UNLESS PoR THE PROJECT. �,.�' �'r F' � <br /> NOTED OTHERWISE. <br /> 7. ALL TRENCHING AND BEDDING FOR STORM DRAINS SHALL CONFORM TO CITY OF -,,,,, �,� <br /> EVERETT STANDARDS. ��FssroNn�. E��`�yi9 <br /> B. ALL STORM DRAIN MANHOLES ARE 48 INCHES W DfAMETER, UNLESS NOTED OTHERWISE. ��II <br /> 9. ALL CATCH BASINS ARE TYPE I, UNLESS NOTED OTHERWISE � issuedfor date <br /> 10. COORDINATE POINTS AND ELEVATIONS SHOWN FOR ALL MANHOLES ARE TO CENTER OF CONSTRUCTION 05/04/2018 <br /> STRUCTURE, UNLESS NOTED OTHERWISE. <br /> DOCUMENTS . <br /> item date <br /> FOUNDATION DRAIN NOTES <br /> 1. ALL FOUNDATION AND UNDERSLAB DRAINAGE CLEANOUTS SHALL BE AS INDICATED WITH <br /> LOCKING LIDS MARKED "FD" <br /> 2. FOUNDATION AND UNDERSLAB DRAINS SHALL BE SLOPED AT A UNIFORM GRADE BETWEEN <br /> INVERT ELEVATIONS SHOWN. � � - � - � - - - � � � � <br /> ' 3. MINIMUM SLOPE OF FOUNDATION DRAINS IS 020 PERCENT UNLESS NOTED OTHERWISE. � � <br /> S 4. ALL FOUNDATION DRAMAGE PIPING SHALL CONNECT TO THE STORM DRAINAGE SYSTEM <br /> i AS INDfCATED. <br /> ¢ <br /> J <br /> 5. ALL FOUNDATION AND UNDERSLAB DRA[NAGE FITTINGS SHALL BE MANUFACTURED <br /> a <br /> BENDS, WYES & TEES. ROLL FITTINGS AS REQUIRED TO MAKE CONNECTIONS. <br /> � 6. ALL VERTICAL DRAINAGE MATERIAL SHALL BE INSTALLED IN ACCORDANCE WITH THE <br /> g MANUFACTURER�S RECOMMENDED MSTALLATfON PROCEDURES. <br /> V <br /> � 7. ALL FOUNDATION DRAW PIPING WHICH PASSES THROUGH STRUCTURAL WALLS SHALL BE _ <br /> SLEEVED. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. <br /> N <br /> > 8. UNLESS NOTED OTHERWISE, THE CONTRACTOR MAY USE ANY COMBINATION OF <br /> o PREFABRICATED FITTINGS (TEES, WYES, BENDS) AT LOCATIONS WHERE DRAfN <br /> � CONNECTIONS POINTS OF MTERSECTION ARE INDICATED. FITTINGS MAY BE ADJUSTED <br /> � AS REOUIRED TO MAINTAIN POSITNE SLOPE. <br /> F 9. SEE STRUCTURAL DRAWINGS FOR BUILDWG FOUNDATION SIZE, SLAB ON GRADE DEPTH <br /> � AND FOUNDATION AND SLAB ON GRADE ELEVATIONS. <br /> � <br /> = 10. RfM ELEVATION FOR ALL CLEANOUT RWG AND COVER SHALL MATCH FINISH GRADE � <br /> N <br /> / <br /> 7 <br /> F <br /> a $h2E� td�E <br /> NOTES <br /> E <br /> K <br /> W <br /> N <br /> � <br /> Q <br /> � sheei number <br /> m <br /> m <br /> N �� � � <br /> m <br /> ti drawn bv LT checked bv RMG <br /> NepiqxvlyolXowyu¢matlm3.in eqlYoyinq rpnpmemin,YMUCvgwpvM�¢. �1 mryMub�namennar¢n¢tlNn�WX�XeeryummpYme�iRSngn¢ uA CWrg!nG3013WMaoryukmaumaLir.[.aiMnprezervM. <br /> ReeIMM.�nuleprn'NpmMvvMYeeµaA�prqNtlm4M1MarelmeJbMzinwenemMsmereb. 11mryMMmMbeMeNeprymee�¢qYdliNee�prvawnvenegreemeniW,eMmnper¢elnm� WHEHPLOiiFOP1NLL5RET1i55HEEiMEA511PE5]O�f) <br /> HeerylMematlmeime. <br />