My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6007 ROCKEFELLER AVE 2022-05-23
>
Address Records
>
ROCKEFELLER AVE
>
6007
>
6007 ROCKEFELLER AVE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 11:42:44 AM
Creation date
3/29/2021 9:14:05 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
6007
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/4/2021 , Page 3 <br />City of Everett <br />8:52:03AM <br />INSPECTION ACTIVITY REPORT _ <br />12/14/2020 12/14/2020 BLDG KMK PARTIALAPPR L 2&3 only 12/11/2020 3:39 PM Olugbenga Dosunmu <br />12-INSULATION <br />Contact Name: Olugbenga Dosunmu <br />Site Address: 6007 ROCKEFELLER AVE <br />Phone:2063712266 <br />e-Mail: godstime4sam@gmail.com <br />12/17/2020 12/17/2020 BLDG SDP CORRECTION Duct bay (12/17/2020 9:20 AM SDP) <br />12-INSULATION insulation/see notes The Ducting in the floor/ ceiling between <br />the garage and the residence cannot <br />displace the required amout of insulation. <br />See Washington Energy Code R403.3.5. <br />Have the building inspector confirm that <br />you have met the requirements of this code <br />at, your insulation inspection. <br />12/22/2020 12/22/2020 BLDG KMK APPROVAL eTRAKiT Inspection 12/19/2020 1:11 AM Olugbenga Dosunmu <br />08-FRAMING Request <br />Contact Name: Olugbenga Dosunmu <br />Site Address: 6007 ROCKEFELLER AVE <br />Phone:2063712266 A. <br />e-Mail: godstime4sam@gmail.com <br />12/28/2020 12/28/2020 BLDG KMK PARTIAL APPR L2,3 ok to mud and 12/24/2020 9:19 PM Olugbenga Dosunmu <br />10-DRYWALL tape <br />Contact Name: Olugbenga Dosunmu <br />Site Address: 6007 ROCKEFELLER AVE <br />Phone:2063712266 <br />e-Mail: godstime4sam@gmail.com <br />1/5/2021 1/5/2021 BLDG KMK APPROVAL see notes 12/29/2020 5:28 PM Olugbenga Dosunmu <br />12-INSULATION <br />Contact Name: Olugbenga Dosunmu <br />Site Address: 6007 ROCKEFELLER AVE <br />Phone:2063712266 <br />e-Mail: godstime4sam@gmail.com <br />(1/5/2021 11:28 AM KMK) <br />1. Homeowner to provide engineering for <br />cut/sloped joists in bathrooms. <br />2. Wall and floor insulation meets code for <br />thermal envelope and mechanical. <br />5/3/2021 5/3/2021 BLDG 16-FINAL KMK APPRVD-PERK Inspection Checklist 4/30/2021 11:50 AM Olugbenga Dosunmu <br />attached <br />Contact Name: Olugbenga Dosunmu <br />Site Address: 6007 ROCKEFELLER AVE <br />Phone:2063712266 <br />e-Mail: godstime4sam@gmail.com <br />INSP12 CRWsysums <br />
The URL can be used to link to this page
Your browser does not support the video tag.