My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6007 ROCKEFELLER AVE 2022-05-23
>
Address Records
>
ROCKEFELLER AVE
>
6007
>
6007 ROCKEFELLER AVE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 11:42:44 AM
Creation date
3/29/2021 9:14:05 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
6007
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shearwall panel. The "Base Plan" calls out "3-2X" in the same location that detail 1S1 shows a 6x6 <br />post. The shearwall schedule calls out for a 3X framing member in the same locations. Please clarify <br />the construction for the concrete and wood walls in these locations. <br />13. Please label each garage with a unique name such as Garage #1 and Garage #2. 11496 INVArt oN <br />14. Provide smoke a rms throughout thgg existing residence per section R314 IRC, show location on <br />each floor [eve .&I1®-ts AUX's �o �tawa ow SM� +3 <br />�4' AZK+! � 15. Specify minimum 36-inch clear width at the hallway between Bedrooms 10 and 11. Show on plans. <br />ON 1h+1�'c��Qt p fY Y <br />as3 stiT. I Specify framing at ceiling and walls where the stairs were removed from the main floor and show a <br />section drawing at the landing on the second floor where the roof is sloped (adjacent to Bathroom <br />.`rem 4. #5). <br />aA-a -t.. S kv;4 <br />In order for the processing of your application to continue, it will be necessary to provide the Building Division <br />with two new sets of revised construction documents reflecting the corrections requested. Please include a <br />response letter which indicates how the corrections were resolved. <br />All codes cited refer to the 2015 International Building Code (IBC), 2015 International Residential Code (IRC), <br />and/or the 2015 Washington State Residential Energy Code (WSEC), as amended by the State of Washington <br />and adopted by the City of Everett. <br />These comments address building issues only. Additional revisions or additions may be required by other <br />departments (such as Utilities, Traffic, Planning or Fire). All required submittals must be of sufficient detail <br />and information to ensure that the proposed structure will be constructed in compliance with all adopted <br />codes. <br />PROVIDE RESPONSE LETTER SHOWING WHERE ALL CORRECTIONS <br />ARE ADDRESSED ON THE PLANS. <br />Sincerely, <br />_ Jeff Heilman <br />Development Technician I Permit Services <br />425.257.8976 13200 Cedar Street, 2"d Floor, Everett, WA 98201 <br />EVERETT Hours: Monday — Friday 7:30am-12:OOpm and 1:OOpm-4:OOpm <br />everettwa.gov I Facebook I Twitter <br />3200 Cedar Street 425.257.8810 everetteps@everettwa.gov <br />Everett, WA 98201 425.257.8857 fax . everettwa.gov/permits <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.