My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3107 COLBY AVE 2021-03-31
>
Address Records
>
COLBY AVE
>
3107
>
3107 COLBY AVE 2021-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 2:54:10 PM
Creation date
3/31/2021 2:53:07 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3107
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> Everett Housing Authority <br /> Administrative Office Upgrades <br /> 03/24/20 <br /> Page 9 <br /> ANSWER: We performed two site visits to this site, and noted only the <br /> additional framing at the existing hatch, no additional framing was noted in <br /> the work area. Please see the roof framing plans for the noted framing, and <br /> the attached photographs for reference. <br /> 8. The Roof Framing Plan on Sheet S21.02 shows new 4x8 beams and appears to show <br /> unspecified connections at the beam-to-beam connections. The make and model of the <br /> connections should be specified. Note that the beam west of the mechanical chase <br /> opening does not appear to show connections. See IBC Section 1603.1, 1604.1, and <br /> 1604.4. <br /> ANSWER: Please see the revised plans for the noted connections. <br /> Lateral: <br /> 9. The Roof and Elevator Roof Plans on Sheet S21.02 reference Sections 6/S40.01, <br /> 8/S50.01, and 12/S50.01 for the elevator shaft construction. The sections reference the <br /> plans for the shaft wall construction, which does not appear to be specified. The <br /> elevator penthouse should be provided with a vertical lateral system. See IBC Sections <br /> 1603.1, 1604.1, 1604.4, 1609.1, ad 1613.1, and ASCE 7-10 Chapters 13 and 16. <br /> ANSWER; Please see the revised plans for the lateral elements. Additionally, <br /> please see the supplemental structural calculations for the lateral analysis of <br /> the elevator doghouse. <br /> Miscellaneous: <br /> 10.The project includes installation of an elevator at Grid D.5/3 on Sheet S00.01. The <br /> following comments should be addressed: <br /> a. The design loads for the elevator system, including impact loading, should be <br /> specified in the"Design Criteria"section of the General Structural Notes on Sheet S. <br /> When actual design loads are not available, estimated design loads should be <br /> specified for the design, and verified when the elevator design drawings are <br /> submitted for review. See IBC Sections 1603.1.8 and 1607.9.1. <br /> b. The connections between the elevator guide rails and the structural framing are <br /> typically the responsibility of the engineer-of-record for the building system. At a <br /> minimum, connection details between the rail bracket and structural framing (e.g., <br /> embedment plates at the concrete walls, etc.) are required. Calculations and details <br /> for the elevator connections to the structural framing should be submitted for <br /> review. The design shall consider concurrent multi-directional loading as determined <br /> by the elevator manufacturer. The required locations and maximum spacing for the <br /> connection points should be specified in the structural drawings. See IBC Section <br /> 107.2.1 and 1604.4. <br /> c. Continuing with the previous comment, the structural drawings appear to require <br /> additional details to connect the HSS columns to the main building and develop the <br />
The URL can be used to link to this page
Your browser does not support the video tag.