My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/03/31 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/03/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 7:37:45 PM
Creation date
3/31/2021 7:07:13 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/31/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E EVERETT <br />Project title: Call for bids for the Trickling Filter #1 Media Replacement project. <br />City Council Agenda Item Cover Sheet <br />Council Bill # Consideration: Call for Bids <br />Project: Trickling Filter #1 Media Replacement <br />Agenda dates requested: Partner/Supplier: None <br />March 31, 2021 Location: Water Pollution Control Facility (WPCF) 4027 — 4th Street <br />Briefing Preceding action: Plans & Systems Ordinance — 2/12/2020 <br />Proposed action Fund: Fund 336 - Water & Sewer System Improvements Fund <br />Consent X <br />Action <br />Ordinance <br />Public hearing Fiscal summary statement: <br />Yes x No The Funding source for this project will be Fund 336 - Water & Sewer System <br />Improvements. The budget for the replacement of the media within Trickling Filters 1 & <br />Budget amendment: 2 is $2,800,000. <br />Yes x No <br />PowerPoint presentation: <br />Yes x No <br />Project summary statement: <br />Staff requests authorization to call for bids for the Trickling Filter #1 Media Replacement <br />Attachments: project. <br />PSA <br />Department(s) involved: <br />Public Works, Legal <br />Contact person: <br />John Nottingham <br />Phone number: <br />425.257.8844 <br />The City has three trickling filters which are treatment components within the <br />mechanical portion of the wastewater treatment plant. Two of these large 85' diameter <br />tanks contain the original treatment media, which is at the end of its useful life, at close <br />to 30 years old. The third filter was constructed in 2015. <br />This project will replace the media within Trickling Filter #1. The treatment media and <br />the aging media support system will be replaced along with any necessary concrete and <br />coating repair work within the interior of the tank. The media within Trickling Filter #2 is <br />currently being replaced under a separate contract. <br />Email: The Engineers estimate for construction of this project is $1,400,000. <br />jnottingham@everettwa.gov <br />Recommendation (exact action requested of Council): <br />Authorize call for bids for the completion of the Trickling Filter #1 Media Replacement <br />project. <br />Initialed by: <br />Department head <br />Administration <br />Council President <br />
The URL can be used to link to this page
Your browser does not support the video tag.