Laserfiche WebLink
Verizorl✓ <br /> [ . .. fr <br /> LEGEND• THIS DRAWING WAS PREPARED SOLELY FOR THE USE <br /> OF VERIZON WRELESS AND MUST ONLY BE USED BY <br /> NEW WORK UNDER THIS CONTRACT VERIZON WIRELESS EMPLOYEES,CONTRACTORS,AND <br /> EXISTING WORK TO REMAIN VENDORS WHILE PERFORMING THE WORK SHOWN CN <br /> THIS DRAWING.ANY OTHER USE OF THIS DRAWING IS <br /> FORBIDDEN. <br /> • <br /> I:.. U n <br /> GENERAL NOTES: <br /> E MORRISON HERSHFIELD <br /> EXISTING UNDERGROUND A. ET.ECTRCAL CONTRACTOR TO PROVIDE AU.NECESSARY FIELD DATA TO DESIGN ENGINEER <br /> ,-J / UTILITY FEED FOR PERFORMING <br /> COORDINATION AND ARC F ASH STUDY. INFORMATION SPREAD SHEET 600 STEWART STREET,SUITE 200 <br /> WILL BE PROVIDED BY DESIGN ENGINEER. SEATTLE,WA 98101 <br /> PHONE:206268.7370 <br /> B. R IS THE CONTRACTOR'S RESPONSIBXJTY TO VISIT THE SITE AND DETERMINE THE EXACT www.monisonhershfield.com <br /> EXTENT OF WORK.COORDINATION.DEMOLITION.TEMPORARY FACIUTIES. UTILITIES,ETC. <br /> ----.1 NECESSARY TO COMPLETE THE PROJECT AS INDICATED ON THECONTRACT DOCUMENTS. - 50 NOT SCALE DRAWINGS. CONTRACTOR MUST <br /> A A A I //'-EXISTING UTILITY PAD C. PSANELBIOERDS AND SWITCHBOARDS CO NOT SHOW ALL BRANCH CIRCUITS. REFER TO VERIFY ALL DIMENSIORS OR <br /> AND ADVISE CONSULTANTS <br /> V\V/\V/1V/ / MOURNED <br /> TRANSFORMER OF ANY ERRORS OMISSIONS.NO VARIATIONS BE <br /> MODIFICATIONS TO WORK SHOWN SHALL BE <br /> D. PROVIDE SEPARATE INSULATED GROUNDING CONDUCTOR IN AU.FEEDER AND BRANCH IMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL <br /> I CIRCUITS. ALL PREVIOUS ISSUES OF THIS DRAWING ARE <br /> SUPERCEDED BY THE LATEST REVISION. ALL <br /> E. PROVIDE UI LRY METERING AS REQUIRED BY UTILITY TO INCLUDE.BUT NOT LIMITED TO DRAWINGS AND SPECIFICAIIONS RERAN THE <br /> THE FOLLOWING:CT'S.PT'S,METER AND TERMINATIONS,FUSED DISCONNECTS, CIRCUIT <br /> I PROPERTY OF MORRISON HERSHFIELD <br /> BREAKER, HOUSING AND ENCLOSURES. coRPDRAnoN. <br /> �_ _JI CARE, <br /> LIIERYYN 10 ENENEW((3)�000 MCM IN4'SCH.40 F. ALL CONDUIT.CA PIPING,G,AND OTHER Mep SYSTEMS NOT 0 <br /> PVC B.F.G.MD MC AEA. ASSOCIATED WITH SPEC/IC CRITICAL EQUIPMENT SPACES (EG.SWRCHROOM.ADJUNCT. <br /> PER&IOHOAUSH COUNTY B TELCO.CONTROL ROOM. RECTIFIER L.BATTERY.ETC.)SHALL BE ROUTED AROUND CRITICAL <br /> EQUIPMENT SPACES IN CORRIDORS OR UNDERSEAS AND NOT THROUGH THESE SPACES. <br /> G. REFER TO PANEL BOARD SCHEDULES FOR BREAKER QUANTITIES. BREAKER SIZES AND <br /> BRANCH CIRCUIT SIZES FOR MORE INFORMATION. <br /> H. REFER TO SHEET EOM FOR UNDERGROUND FEEDER REQUIREMENTS. W <br /> ED. I. ALL BREAKERS RATED 10OAMP AND ABOVE SHALL BE 100K RATED. co O <br /> SERVICE ILAN CODAIC8 Y+WY 1/ JW MAC ENCLOSURE J. ALL NEW CIRCUIT BREAKERS IN ALL DISTRIBUTION BOARDS AND PANEL BOARDS SHALL — CCo J� <br /> 400^/2 HAVE%TIC'RATING AS NDICATED ON DRA VINGS. o m <br /> mn <br /> 1 i K. PER LISTING EQUIPMENT SFR IIRAGIJ BE LISTED AND LABELED BY UL AND SHALL SE INSTALLED O v N 0 co <br /> W N <br /> LAR 1 INN SERVICE GROUND <br /> I � O w Q Q rn <br /> TO(��/�''CONDUCTOR�� 1 —G 1 Y TERMINATIONS <br /> LOGS TO ECONdNEERANO gWIER AFTER COMPLETION PRQQIUECT. U m H. a <br /> IfGPPE1t CUD GROUND D RODE I N O <br /> S A MIL Of W-Q'moat Lam ■ N=Z I—U-I <br /> NEW(S)2BD ADM.t/4 qQ N Lij <br /> C O c`'''\I > <br /> J_ 2-,/2'RYG AFR ANO RNC SOFA m W W <br /> _ xxvi2 > ,(7.-) LLI <br /> tJFN►P"REL 81 RRH 915(=D4t�7U1R/) CO <br /> NOV(3)000 MOM,1/3 GAD N SOW 34DIw Ili <br /> �IIC <br /> 4'IOC A.6.MD INC BAG. ��; �,+ iw w.,......�.�-� <br /> I I 0, 11 <br /> 1 1 -_-- _ -....1 REV'DESCRIPTION i DATE <br /> Cm'2142 <br /> MAN A lISSUEO FOR 90%SUBMITTAL 0829.201T <br /> NE/4pp�/� 1 B RNSSUED FOR 90%SUBMITTAL ' 11 Y2.201] <br /> ,ITEITY LWI 1 + �, 1 C ISSUED FOR 100%EOS SUBMITTAL i 01.05.2018 <br /> 0 7 ISSUED FOR PERMIT ` 02.07.2018 <br /> ,Dw1/-;;;D EMERGENCY 06EL GENERATOR WITH A <br /> INTERSECT IMM I ar Ny Qk • <br /> 30o lDII WIC <br /> �/ NETWORK COMPLIANCE SUBMITTALS , DATE <br /> 2-WIRE PARALLEL START PRELIMINARY SUBMISSION <br /> 1 1 BOON.IN I•CONDLRT • <br /> I • <br /> 30%SUBMISSION • <br /> . <br /> ______ J ,`.". 80%SUBMSSION • <br /> 90%SUBMSSION 1 11.22.2017 <br /> NEW 2/12, 141E GM.IN 3/4' 100%SUBMISSION i 01.052018 <br /> C.ETR EACH GEN.BAIT. ORIGNAL ISSUE • <br /> CHARGER AND BLOCK HEADER ISSUED FOR CONSTRUCTION . <br /> -- ISSUED FOR PERMIT I 02.072018 <br /> - RECORD SET(AS-BULTS) <br /> PROJECT NO: STAMP <br /> 7170182 <br /> '< <br /> CAD DWGFEE: V/.-OV, '',-3 <br /> DESIGNED BY: FA / 'T /�f, <br /> DRAWN BY: LP Y ��F,�V/ • <br /> CHECKED BY: RL Po 525,3_0l/e <br /> COPYRIGHT 20 .,.OHJ$005T1,I I' <br /> \ / J17t�ni t <br /> SHEET TITLE <br /> ELECTRICAL <br /> (-7 -5://(---(____S:,) ONE-LINE <br /> DIAGRAM <br /> ELECTRICAL ONE—LIN IAGRAM 1 SHEET NUMBER E701 <br />