My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 RIVERSIDE RD AMAZON 2021-04-01
>
Address Records
>
RIVERSIDE RD
>
607
>
AMAZON
>
607 RIVERSIDE RD AMAZON 2021-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 12:14:05 PM
Creation date
4/1/2021 12:09:13 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
607
Tenant Name
AMAZON
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> pill Architecture <br /> Engineering <br /> IEnvironmental <br /> Ali Land Surveying <br /> Companies <br /> SWA1 - Everett <br /> BL PROJECT: 1900494 of <br /> PERMIT REVISIONS jut4 O <br /> cITY <br /> TO: Drew Martin,Commercial Plans Examiner p errnit Se iv t <br /> CC: Barbara Joslin,BL Companies <br /> Bryan Ploetz, Sierra Construction Company <br /> FROM: Jason Ferrisi, BL Companies <br /> DATE: June 19,2019 <br /> Building Review Comments <br /> The following changes describe Delta 1: Building Review Comments issued June 19, 2019. BL Company <br /> responses have been added in red to address each comment. <br /> Architectural <br /> Fire Protection: <br /> 1. Partial Plan 3/A1.02 specified two-hour walls for Electrical Room 3/A1.02. It appears the <br /> room construction is intended to satisfy the requirements of IBC Section 903.3.1.1.1 Item 3. <br /> The design intent for this area should be clarified. In addition, the following comments shall <br /> be addressed: <br /> a. The two-hour wall shown in Wall Type 11R, per Detail 2/G0.01, is a one-hour wall per <br /> the referenced listing with an additional layer of 5/8-inch GWB added to each side. This <br /> does not qualify as a two-hour wall. A listing for a tested assembly consistent with the <br /> proposed construction shall be referenced. See IBC Section 721.1. <br /> BL Response: UL Listing 404 — Configuration B has been provided on sheet G0.04. A note <br /> has been added to wall type "11R"on sheet G0.01, to refer to the added UL listing. <br /> b. The existing west wall does not appear to be two-hour construction and shall be <br /> modified. <br /> BL Response: A 2 hour rated shaft wall assembly has been added at Emergency Electrical <br /> 204 on A1.02. Wall type"10R" has been added to the wall types on G0.01. UL Listing 415 — <br /> Configuration B has been provided on sheets G0.05 and G0.06. <br /> c. Partial Plan 11/A2.02 shows the reflected ceiling plan for Room 3/A1.02, and references <br /> Section 7/A2.02 for the ceiling construction. The ceiling shall be two-hour construction. <br /> The Section shall include a listed for a rated assembly. See IBC Section 721.1. <br /> BL Response: Section detail 7/A2.02 has been revised to reflect 2-hour rated horizontal shaft <br /> assembly. UL Listing 415 — Configuration B has been referenced. <br /> d. Continuing with the previous comment, Detail 7/A2.02 provides conflicting information <br /> for the GWB, stating both 1/2-inch and 5/8-inch sheathing. The detail shall be revised. <br /> BL Response: Section detail 7/A2.02 has been revised to reflect 2-hour rated horizontal shaft <br /> assembly. UL Listing 415 — Configuration B has been referenced. <br />
The URL can be used to link to this page
Your browser does not support the video tag.