Laserfiche WebLink
12/12/2019 Page 2 <br /> City of Everett <br /> 10:33:33MVI <br /> INSPECTION ACTIVITY REPORT <br /> 8/19/2019 8/19/2019 ELEC 05-SERVICE SKB PARTIAL APPR eTRAKiT Inspection 8/16/2019 8:48 AM <br /> Request Panels <br /> Contact Name:Alex <br /> Site Address:607 RIVERSIDE RD <br /> Phone:2535619234 <br /> e-Mail:tarask@olsenelectric.net <br /> (8/19/2019 10:14 AM SKB) <br /> Panel LP2 to transformer to panel RP2. <br /> Panel LP3 to transformer to panel <br /> RP3.Panel LPAR to transformer to panel <br /> RPAR.Panel LP1 to transformer to panel <br /> RP1A and B.Panel LT1 Normal power into <br /> transfer switch.Panel ELP to transformer to <br /> panel ERP. <br /> 8/19/2019 8/19/2019 ELEC SKB NOT READY eTRAKiT Inspection 8/16/2019 11:58 AM <br /> 03-SLAB/CONDUI Request PM ditch inspection <br /> Contact Name:Alex R <br /> Site Address:607 RIVERSIDE RD <br /> Phone:2535619234 <br /> e-Mail:tarask@olsenelectric.net <br /> 8/20/2019 8/20/2019 ELEC 02-GROUND SKB PARTIAL APPR eTRAKiT Inspection 8/19/2019 10:45 AM <br /> WORK Request Ditch Inspection <br /> Contact Name:Alex R <br /> Site Address:607 RIVERSIDE RD <br /> Phone:2535619234 <br /> e-Mail:tarask@olsenelectric.net <br /> (8/20/2019 10:02 AM SKB) <br /> Building to generator. <br /> 8/20/2019 8/20/2019 ELEC 06-ROUGH SKB PARTIAL APPR eTRAKiT Inspection 8/19/2019 10:46 AM <br /> IN Request HVAC <br /> Contact Name:Alex R <br /> Site Address:607 RIVERSIDE RD <br /> Phone:2535619234 <br /> e-Mail:tarask@olsenelectric.net <br /> (8/20/2019 9:21 AM SKB) <br /> skb changed Inspection Type from ELEC <br /> 08-OTHER to ELEC 06-ROUGH IN <br /> (8/20/2019 10:02 AM SKB) <br /> Disconnect to transformer to disconnect to <br /> panel MDF.All rooftop units excluding <br /> fans. <br /> 8/21/2019 8/21/2019 ELEC 09-FINAL SKB PARTIAL APPR eTRAKiT Inspection 8/20/2019 10:29 AM <br /> Request <br /> Contact Name:Alex R <br /> Site Address:607 RIVERSIDE RD <br /> Phone:2535619234 <br /> e-Mail:tarask@olsenelectric.net <br /> (8/21/2019 10:26 AM SKB) <br /> Front entry and break room areas excluding <br /> floor plan.Cord drops N.South Center <br /> robot area.Provide evidence of server <br /> permit and have the server system <br /> inspected.Provide evidence core <br /> connections are suitable for vertical load <br /> feeding the server. <br /> 8/21/2019 8/21/2019 ELEC 06-ROUGH SKB PARTIAL APPR (8/21/2019 10:26 AM SKB) <br /> IN Panel HDP1 and loads out including panels <br /> HDP2 and MDF automatic transfer switch <br /> excluding generator connection panel <br /> HDP2 and loads and automatic transfer <br /> switch panel ELP excluding generator <br /> connection. <br /> INSP12 RWS ys Ttm,s <br />